DNV DNV-RU-HSLC PART 3 CHAPTER 1 PDF

DNV DNV-RU-HSLC PART 3 CHAPTER 1 PDF

Name:
DNV DNV-RU-HSLC PART 3 CHAPTER 1 PDF

Published Date:
01/01/2011

Status:
[ Revised ]

Description:

STRUCTURES, EQUIPMENT - Design Principles, Design Loads

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

General

As of October 2010 all DNV service documents are primarily published electronically.

In order to ensure a practical transition from the “print” scheme to the “electronic” scheme, all rule chapters having incorporated amendments and corrections more recent than the date of the latest printed issue, have been given the date January 2011.

An overview of DNV service documents, their update status and historical “amendments and corrections” may be found through http://www.dnv.com/resources/rules_standards/.


Edition : 11
File Size : 1 file , 320 KB
Number of Pages : 25
Published : 01/01/2011

History

DNV DNV-RU-HSLC PART 3 CHAPTER 1
Published Date: 07/01/2012
STRUCTURES, EQUIPMENT - Design Principles, Design Loads
$17.1
DNV DNV-RU-HSLC PART 3 CHAPTER 1
Published Date: 01/01/2011
STRUCTURES, EQUIPMENT - Design Principles, Design Loads
$17.1
DNV DNV-RU-HSLC PART 3 CHAPTER 1
Published Date: 01/01/2011
STRUCTURES, EQUIPMENT - Design Principles, Design Loads
$17.1
DNV DNV-RU-HSLC PART 3 CHAPTER 1
Published Date: 01/01/2005
STRUCTURES, EQUIPMENT - Design Principles, Design Loads
$17.1
DNV DNV-RU-HSLC PART 3 CHAPTER 1
Published Date: 01/01/2005
STRUCTURES, EQUIPMENT - Design Principles, Design Loads
$17.1

Related products

DNV DNV-RU-SHIPS PART 4 CHAPTER 8
Published Date: 07/01/2016
NEWBUILDINGS MACHINERY AND SYSTEMS - MAIN CLASS - Electrical Installations
$17.1
DNV DNV-RP-B401
Published Date: 10/01/2010
CATHODIC PROTECTION DESIGN
$43.5
DNV GL SHIP TECHNOLOGY I-4-1
Published Date: 05/01/1997
I-Rules for Classification and Construction Ship Technology Part 4-Rigging Technology Chapter 1-Tall Ship Rigs
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 3
Published Date: 01/01/2016
NEW BUILDINGS HULL AND EQUIPMENT – MAIN CLASS Hull equipment and safety
$17.1

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants