DNV DNV-ST-F121 PDF

DNV DNV-ST-F121 PDF

Name:
DNV DNV-ST-F121 PDF

Published Date:
09/01/2019

Status:
[ Active ]

Description:

Pipeline installation by horizontal directional drilling

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
dnv-dnv-st-f121_2792529

Choose Document Language:
43.50
Need Help?

This standard provides guidance and requirements for all phases of the horizontal directional drilling project for installing pipelines beneath obstructions, such as rivers and highways, and for shore approach of offshore pipelines, including:

— requirements for site investigations

— aspects related to HDD basic engineering

— aspects related to HDD detailed engineering

— requirements for equipment and tools to be used

— requirements for drilling fluid

— requirements for steering system

— requirements for HDD personnel

— aspects related to the product pipeline

— aspects related to HDD planning and documentation.


Edition : 19
File Size : 1 file , 1.5 MB
Number of Pages : 84
Published : 09/01/2019

History

DNV DNV-ST-F121
Published Date: 09/01/2019
Pipeline installation by horizontal directional drilling
43.50 €
DNV DNVGL-ST-F121
Published Date: 09/01/2019
Pipeline installation by horizontal directional drilling
43.50 €

Related products

DNV DNV-RU-SHIPS PART 3 CHAPTER 1
Published Date: 01/01/2016
NEW BUILDINGS HULL AND EQUIPMENT – MAIN CLASS Hull structural design - Ships with length 100 metres and above
17.10 €
DNV DNV TAP NO. MR-A003
Published Date: 07/01/2013
Computers and Programmable Logic Controllers
17.10 €
DNV DNV-RU-HSLC PART 0 CHAPTER 6
Published Date: 01/01/2011
INTRODUCTION - IMO High Speed Craft Code
17.10 €
DNV DNV-RU-HSLC PART 6 CHAPTER 3
Published Date: 08/01/2021
Part 6 Additional class notations - Chapter 3 Navigation and manoeuvring
17.10 €

Best-Selling Products