DNV DNVGL-CG-0042 PDF

DNV DNVGL-CG-0042 PDF

Name:
DNV DNVGL-CG-0042 PDF

Published Date:
07/01/2019

Status:
[ Revised ]

Description:

Cargo vapour recovery systems

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?
W/D S/S BY DNV-CG-0042 * NO LONGER AVAILABLE

General

This class guideline gives requirements for cargo vapour recovery systems required to be fitted for class notation VCS(3) and VCS(L, X%) according to DNV GL rules for classification: Ships DNVGL-RU-SHIP Pt.6 Ch.4 Sec.11 Cargo operations, on the following working principles:

— re-absorption of cargo vapours in the liquid cargo itself

— liquefaction of cargo vapours

— other principles may be considered on a case-by-case basis.

For systems where volatile organic compounds (VOC) shall be used as gas fuel for combustion machinery, DNVGL-RU-SHIP Pt.6 Ch.2 Sec.5 Gas fuelled ship installations, shall be taken into account to any part of the system interfacing with such a gas fuel system. Note that the use of VOC as fuel on board ships normally also require flag administration approval.

The requirements for this class notation are additional to the requirements for main class, given in DNVGL-RU- SHIP Pt.1 to DNVGL-RU-SHIP Pt.4. App.A Table 1 shows some applicable rule references.

Refrigeration systems shall comply with the requirements given in DNVGL-RU-SHIP Pt.4 Ch.6 Piping systems. Where the refrigerant is a flammable medium, the refrigeration system shall comply with the requirements given in DNVGL-RU-SHIP Pt.5 Ch.7 Liquefied gas tankers.

The requirements shall apply to any vapour recovery system when installed onboard vessels classed with the Society.


Edition : 19
File Size : 1 file , 140 KB
Number of Pages : 23
Published : 07/01/2019

History

DNV DNV-CG-0042
Published Date: 08/01/2021
Cargo vapour recovery systems
$17.1
DNV DNVGL-CG-0042
Published Date: 07/01/2019
Cargo vapour recovery systems
$17.1
DNV DNVGL-CG-0042
Published Date: 11/01/2015
Cargo vapour recovery systems
$17.1

Related products

DNV DNV-RU-SHIPS PART 6 CHAPTER 6
Published Date: 01/01/2003
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS - ADDITIONAL CLASS - Centralised Cargo Control for Liquid Cargoes
$17.1
DNV DNV-OSS-301
Published Date: 01/01/2014
Verification and Certification of Submarine Pipelines
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 2
Published Date: 01/01/2015
NEWBUILDINGS HULL AND EQUIPMENT - MAIN CLASS - Hull structural design - Ships with length less than 100 metres
$17.1
DNV DNV-RU-SHIPS PART 7 CHAPTER 8
Published Date: 01/01/2003
SHIPS IN OPERATION - MACHINERY SURVEY ARRANGEMENTS
$17.1

Best-Selling Products

Modern Drafting Practices & Standards Manual
Published Date: 01/01/1994
$122.7