DNV DNVGL-CG-0172 PDF

DNV DNVGL-CG-0172 PDF

Name:
DNV DNVGL-CG-0172 PDF

Published Date:
07/01/2015

Status:
[ Revised ]

Description:

Thickness diminution for mobile offshore units

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?
W/D S/S BY DNV-CG-0172 * NO LONGER AVAILABLE

This document focuses on ship shaped units, column-stabilized units, and jack-ups. Notwithstanding, the principles may be extended to all types of floating offshore units/installations based on a case by case acceptance from the Society.

The document may also be used as a guidance for evaluation of units for conversion, like tanker conversion to FPSO/FSO.

As not all designs or cases can be covered, the content herein shall then be used with due regard to specific design limitations.


Edition : 15
File Size : 1 file , 1.2 MB
Number of Pages : 31
Published : 07/01/2015

History

DNV DNV-CG-0172
Published Date: 10/01/2022
Allowable thickness diminution for offshore floating units
$17.1
DNV DNVGL-CG-0172
Published Date: 07/01/2015
Thickness diminution for mobile offshore units
$17.1

Related products

DNV DNV-RP-C205
Published Date: 04/01/2014
Environmental Conditions and Environmental Loads
$43.5
DNV GL ADDITIONAL RULES AND GUIDELINES VI-11-10
Published Date: 07/01/2016
VI-Rules for Classification and Construction Additional Rules and Guidelines Part 11-Other Operations and Systems Chapter 10-Guidelines on Ballast Water Management
$17.1
DNV DNV-OS-D101
Published Date: 07/01/2021
Marine and machinery systems and equipment
$17.1
DNV DNV-RP-D202
Published Date: 10/01/2013
Witnessing of Low Sulphur Fuel Changeover and Operations
$17.1

Best-Selling Products