DNV DNVGL-RP-0142 PDF

DNV DNVGL-RP-0142 PDF

Name:
DNV DNVGL-RP-0142 PDF

Published Date:
04/01/2015

Status:
[ Obsolete ]

Description:

Wellhead fatigue analysis

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

Scope and applicability

The scope of this RP addresses the full lifecycle of any offshore well system. The assessment of wellhead fatigue damage under this RP is applicable during all stages or types of operations when riser systems interface to the well, including drilling, completion, production, workover, and P&A. Fatigue accumulation continues until the riser is ultimately disconnected from the wellhead.

This document provides a consolidated framework for fatigue assessment of subsea and surface well systems by considering the following:

— computation of both mean and cyclic loads experienced by the wellhead/casing system for each set of conditions

— relationship between cyclic loads and cyclic stresses, e.g., load-to-stress curves, stress amplification/ concentration factors, etc., for each location of interest

— damage model, e.g., S-N approach, initiation life method, fracture mechanics, etc., used to estimate fatigue damage at each location of interest.

Example locations of interest within the well system are listed in [4.1].

This document discusses several existing analysis methodologies and common assumptions typically used for the global model, local model(s), damage model, and fatigue calculations; however, a specific analysis methodology or set of assumptions is not prescribed. Moreover, different analysis approaches and differing levels of detail can be chosen, depending on the stage of the project, e.g., preliminary design, detailed design, hindcasting/forecasting, etc., and availability of required inputs.


Edition : 15
File Size : 1 file , 4.1 MB
Number of Pages : 63
Published : 04/01/2015

History


Related products

DNV DNV-RU-YACHT PART 3 CHAPTER 8
Published Date: 07/01/2022
Part 3 Hull - Chapter 8 Hull equipment
$17.1
DNV DNV-RU-SHIPS PART 5 CHAPTER 5
Published Date: 07/01/2016
NEW BUILDINGS SPECIAL SERVICE AND TYPE – ADDITIONAL CLASS Liquefied gas carriers
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 15
Published Date: 07/01/2024
Part 3 Hull - Chapter 15 Stability
$17.1
DNV DNV-RU-HSLC PART 4 CHAPTER 6
Published Date: 07/01/2023
Part 4 Systems and components - Chapter 6 Piping systems
$17.1

Best-Selling Products

CAN/CSA-IEC 31010:20
Published Date: 04/01/2020
Risk management - Risk assessment techniques (Adopted IEC 31010:2019, second edition, 2019-06)
$70.5
CAN/CSA-IEC 61000-4-15:12 (R2021)
Published Date: 06/01/2012
CAN/CSA-IEC 61000-4-15:12 - Electromagnetic compatibility (EMC) - Part 4-15: Testing and measurement techniques - Flickermeter - Functional and design specifications (Adopted IEC 61000-4-15:2010, edition 2.0, 2010-08)
$69.3
CAN/CSA-IEC 61000-4-18:14 (R2023)
Published Date: 10/01/2014
Electromagnetic compatibility (EMC) - Part 4-18: Testing and measurement techniques - Damped oscillatory wave immunity test (Adopted IEC 61000-4-18:2011, edition 1:2006 consolidated with amendment 1:2010)
$78
CAN/CSA-IEC 61000-4-2:12 (R2022)
Published Date: 06/30/2012
Electromagnetic Compatibility (EMC) - Part 4-2: Testing and Measurement Techniques - Electrostatic Discharge Immunity Test (Adopted CEI/IEC 61000-4-2:1995 + A1:1998, edition 1.1, 1999-05)
$84.9
CAN/CSA-IEC 61000-4-3:21
Published Date: 05/01/2021
Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test (IEC 61000-4-3:2006+A1:2007+A2:2010, IDT)
$184.8
CAN/CSA-IEC 61000-4-30:16
Published Date: 08/05/2022
Amendment 1 to Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques - Power quality measurement methods (Adopted IEC 61000-4-30:2015, third edition, 2015-02)
$3.3