DNV DNVGL-RP-0232 PDF

DNV DNVGL-RP-0232 PDF

Name:
DNV DNVGL-RP-0232 PDF

Published Date:
09/01/2018

Status:
[ Revised ]

Description:

Pipeline and cable laying equipment

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?
W/D S/S BY DNV-RP-0232 * NO LONGER AVAILABLE

These guidelines and specifications cover the equipment associated with pipeline and cable laying operations, regardless of the laying method (J lay, S lay, Flex lay, Reel Lay, etc. ). The laying operations cover the spectrum of operations from load-out, transportation and pipeline and cable handling to laying or retrieving, recovery and repair.


Edition : 18
File Size : 1 file , 360 KB
Number of Pages : 41
Published : 09/01/2018

History

DNV DNV-RP-0232
Published Date: 09/01/2018
Pipeline and cable laying equipment
$17.1
DNV DNVGL-RP-0232
Published Date: 09/01/2018
Pipeline and cable laying equipment
$17.1

Related products

DNV DNV-RU-SHIPS PART 6 CHAPTER 26
Published Date: 07/01/2016
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS - ADDITIONAL CLASS - Dynamic Positioning System with Enhanced Reliability
$17.1
DNV DNV-RU-SHIPS PART 5 CHAPTER 3
Published Date: 07/01/2016
NEWBUILDINGS SPECIAL SERVICE AND TYPE - ADDITIONAL CLASS - Oil carriers
$17.1

Best-Selling Products