DNV DNVGL-RP-F104 PDF

DNV DNVGL-RP-F104 PDF

Name:
DNV DNVGL-RP-F104 PDF

Published Date:
09/01/2019

Status:
[ Revised ]

Description:

Design and operation of carbon dioxide pipelines

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?

Scope and application 

This document applies to:

— rigid metallic pipelines and risers

— pipeline networks

— new onshore and offshore pipelines for transportation of fluids containing overwhelmingly CO2

— conversion of existing pipelines for transportation of fluids containing overwhelmingly CO2

— pipeline transportation of:

— anthropogenic CO2 in the context of CCS

— anthropogenic CO2 in the context of combined CCS and EOR

— CO2 captured from hydrocarbon stream — CO2 from natural (geological) sources for the purpose of EOR

— CO2 from other sources.

— pipelines as defined in the referenced standards, see [1.5.1]

— transport of CO2 in gaseous-, liquid and super critical phases

— extent of pipeline system as described in [1.6.1].

Guidance note:

In this document, the term ‘overwhelmingly CO2’ refers to definitions given in the London Convention, the OSPAR convention and the EU CCS Directive. The actual percentage of CO2 and other components present in the CO2 stream shall be determined based upon technological and economical evaluations, and appropriate regulations governing the capture, transport and storage elements of a CCS project.

This document does not address how to secure public awareness and acceptance on a local/national level. This is, however, an important issue that needs to be managed carefully as an integral part of the pipeline development.

 


Edition : 19
File Size : 1 file , 1.1 MB
Number of Pages : 76
Published : 09/01/2019

History

DNV DNV-RP-F104
Published Date: 02/01/2021
Design and operation of carbon dioxide pipelines
$43.5
DNV DNVGL-RP-F104
Published Date: 02/01/2021
Design and operation of carbon dioxide pipelines
$43.5
DNV DNVGL-RP-F104
Published Date: 09/01/2019
Design and operation of carbon dioxide pipelines
$43.5
DNV DNVGL-RP-F104
Published Date: 11/01/2017
Design and operation of carbon dioxide pipelines
$43.5

Related products

DNV DNV TAP NO. 843.20-MED A.1/4.6
Published Date: 04/01/2009
ECHO SOUNDING EQUIPMENT
$17.1
DNV DNVGL-RU-NAVAL PART 1 CHAPTER 5
Published Date: 01/01/2016
Part 1 Classification and surveys - Chapter 5 Surveys for submarines
$17.1
DNV DNV-OSS-202
Published Date: 04/01/2011
Verification for Compliance with UK Shelf Regulations
$17.1
DNV DNV-RU-HSLC PART 5 CHAPTER 8
Published Date: 08/01/2021
Part 5 Ship types - Chapter 8 Naval landing craft
$17.1

Best-Selling Products

LAN Technologies Explained
Published Date: 04/01/2000