DNV DNVGL-RP-F204 PDF

DNV DNVGL-RP-F204 PDF

Name:
DNV DNVGL-RP-F204 PDF

Published Date:
09/01/2019

Status:
[ Revised ]

Description:

Riser fatigue

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?
W/D S/S BY DNV-RP-F204 * NO LONGER AVAILABLE

This recommended practice gives guidance on fatigue assessment of risers using S-N curve approach. The document describes what cyclic loading to consider, what typical critical locations to focus on, gives guidance on global load effect and VIV analyses and local stress analyses, fatigue strength by S-N curves and fatigue damage assessment.


Edition : 19
File Size : 1 file , 1.8 MB
Number of Pages : 107
Published : 09/01/2019

History

DNV DNV-RP-F204
Published Date: 09/01/2019
Riser fatigue
$43.5
DNV DNVGL-RP-F204
Published Date: 09/01/2019
Riser fatigue
$43.5
DNV DNVGL-RP-F204
Published Date: 10/01/2017
RISER FATIGUE
$43.5
DNV DNV-RP-F204 NOTICE
Published Date: 10/01/2017
RISER FATIGUE
DNV DNV-RP-F204
Published Date: 10/01/2010
RISER FATIGUE
$43.5
DNV DNV-RP-F204
Published Date: 07/01/2005
RISER FATIGUE
$43.5
DNV DNV-RP-F204
Published Date: 07/01/2005
RISER FATIGUE
$43.5

Related products

DNV DNV-CG-0313
Published Date: 07/01/2022
Measurement procedures for noise emission
$17.1
DNV DNV-CP-0213
Published Date: 03/01/2022
Fire safety equipment
$17.1
DNV DNV TAP NO. 10-706.70-1
Published Date: 04/01/2009
MACHINERY PLANNED MAINTENANCE SYSTEM (MPMS)
$17.1
DNV GL SHIP TECHNOLOGY I-0
Published Date: 01/01/2017
I-Rules for Classification and Construction Ship Technology Part 0-Classification and Surveys
$17.1

Best-Selling Products

SN-INSTA/TS 950:2014
Published Date: 04/30/2014
Fire Safety Engineering - Comparative method to verify fire safety design in buildings
SN-INSTA/TS 952:2019
Published Date: 08/20/2019
Fire Safety Engineering - Review and Control in the Building Process