DNV DNVGL-RP-G101 PDF

DNV DNVGL-RP-G101 PDF

Name:
DNV DNVGL-RP-G101 PDF

Published Date:
01/01/2021

Status:
[ Revised ]

Description:

Risk-based inspection of offshore topsides static mechanical equipment

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?
W/D S/S BY DNV-RP-G101 * NO LONGER AVAILABLE

This RP describes a method for establishing and maintaining a risk-based inspection plan for offshore pressure systems. It provides guidelines and recommendations on how to customise methods and working procedures that support the inspection planning process. .

This RP covers the planning of in-service inspection for offshore topsides static mechanical pressure systems when considering failures by loss of containment of the pressure envelope. Failure modes and functional failures, such as failure to operate on demand, leakage through gaskets, flanged connections, valve stem packing, together with valve passing and tube clogging are not addressed in this document.


Edition : 21
File Size : 1 file , 3.9 MB
Number of Pages : 143
Published : 01/01/2021

History

DNV DNV-RP-G101
Published Date: 01/01/2021
Risk-based inspection of offshore topsides static mechanical equipment
$43.5
DNV DNVGL-RP-G101
Published Date: 01/01/2021
Risk-based inspection of offshore topsides static mechanical equipment
$43.5
DNV DNVGL-RP-G101
Published Date: 07/01/2017
Risk based inspection of offshore topsides static mechanical equipment
$43.5
DNV DNV-RP-G101
Published Date: 10/01/2010
RISK BASED INSPECTION OF OFFSHORE TOPSIDES STATIC MECHANICAL EQUIPMENT
$43.5
DNV DNV-RP-G101
Published Date: 04/01/2009
RISK BASED INSPECTION OF OFFSHORE TOPSIDES STATIC MECHANICAL EQUIPMENT
$43.5
DNV DNV-RP-G101
Published Date: 04/01/2009
RISK BASED INSPECTION OF OFFSHORE TOPSIDES STATIC MECHANICAL EQUIPMENT
$43.5
DNV DNV-RP-G101
Published Date: 01/01/2002
Risk Based Inspection of Offshore Topsides Static Mechanical Equipment
$43.5

Related products

DNV DNV-CP-0086
Published Date: 08/01/2022
Adhesive systems
$17.1
DNV DNV-RP-F206
Published Date: 04/01/2008
RISER INTEGRITY MANAGEMENT
$43.5
DNV DNV-RU-YACHT PART 4 CHAPTER 3
Published Date: 07/01/2022
Part 4 Systems and components - Chapter 3 Rotating machinery - drivers
$17.1
DNV DNV-RU-HSLC PART 7 CHAPTER 1
Published Date: 07/01/2024
Part 7 Fleet in service – retention of class - Chapter 1 Class retention systematics
$17.1

Best-Selling Products

ASSP/AIHA Z10-2012 (R2017)
Published Date: 06/27/2012
Occupational Health & Safety Management Systems (Formerly ASSE/AIHA Z10-2012 (R2017))
ASSP/AIHA Z88.10-2001
Published Date: 06/08/2001
Respirator Fit Testing Methods
ASSP/AIHA Z88.10-2010
Published Date: 12/03/2010
Respirator Fit Testing Methods
ASSP/AIHA Z88.7-2010
Published Date: 06/14/2010
Color Coding of Air-purifying Respirator Canisters, Cartridges, and Filters
ASSP/AIHA Z9.1-2006
Published Date: 08/18/2006
Ventilation and Control of Airborne Contaminants During Open-Surface Tank Operations
$27.3
ASSP/AIHA Z9.10-2010
Published Date: 11/16/2010
Fundamentals Governing the Design and Operation of Dilution Ventilation Systems in Industrial Occupancies
$29.4