DNV DNVGL-RU-OU-0103 PDF

DNV DNVGL-RU-OU-0103 PDF

Name:
DNV DNVGL-RU-OU-0103 PDF

Published Date:
07/01/2018

Status:
[ Revised ]

Description:

Floating LNG/LPG production, storage and loading units

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

These rules cover classification of floating offshore objects for the following services:

— LNG/LPG production

— LNG/LPG storage and offloading

— LNG/LPG loading (buoy).

Although this document refers primarily to liquefied natural gas (LNG) and liquefied petroleum gas (LPG), the principles herein may also be used for other offshore gas installations such as those involving primarily compressed natural gas (CNG), and gas to liquid (GTL) products.

A floating offshore installation which processes hydrocarbons and refrigerates gas to produce LNG will be termed here an LNG FPSO (LNG floating production, storage and offloading unit). LNG FPSOs are also commonly termed FLNG. The installation may be fed gas directly from a gas well or a gas network or may process associated gas in conjunction with oil production. Such units may also produce, store and offload quantities of LPG and condensate.

A floating offshore installation which processes hydrocarbons and refrigerates gas to produce LPG will be termed here an LPG FPSO (LPG floating production, storage and offloading unit). The installation may be fed gas directly from a gas well or a gas network or may process associated gas in conjunction with oil production. Such units may also produce, store and offload quantities of condensate.

An offshore installation which receives and regasifies LNG is termed an FSRU (floating storage and regasification unit). The storage and hull may generally follow the requirements to a storage unit described in Ch.2 Sec.4. The regasification plant and safety systems may follow the requirements in DNVGL-RU-SHIP Pt.6 Ch.4 Sec.7 on regasification vessels. FSRUs which follow a ship class regime may refer to DNVGL-RU-SHIP Pt.5 Ch.7 and DNVGL-RU-SHIP Pt.6 Ch.4 Sec.7.

Principles, procedures and requirements for retention of class during operation of the unit are covered DNVGL-RU-OU-0300.


Edition : 18
File Size : 1 file , 1.8 MB
Number of Pages : 128
Published : 07/01/2018

History

DNV DNV-RU-OU-0103
Published Date: 07/01/2024
Floating LNG/LPG production, storage and loading units
$17.1
DNV DNV-RU-OU-0103
Published Date: 07/01/2023
Floating LNG/LPG production, storage and loading units
$17.1
DNV DNV-RU-OU-0103
Published Date: 07/01/2022
Floating LNG/LPG production, storage and loading units
$17.1
DNV DNV-RU-OU-0103
Published Date: 07/01/2021
Floating LNG/LPG production, storage and loading units
$17.1
DNV DNVGL-RU-OU-0103
Published Date: 07/01/2020
Floating LNG/LPG production, storage and loading units
$17.1
DNV DNVGL-RU-OU-0103
Published Date: 07/01/2019
Floating LNG-LPG production, storage and loading units
$17.1
DNV DNVGL-RU-OU-0103
Published Date: 07/01/2018
Floating LNG/LPG production, storage and loading units
$17.1
DNV DNVGL-RU-OU-0103
Published Date: 01/01/2018
Floating LNG/LPG production, storage and loading units
$17.1
DNV DNVGL-RU-OU-0103
Published Date: 01/01/2017
Floating LNG/LPG production, storage and loading units
$17.1
DNV DNVGL-RU-OU-0103
Published Date: 04/01/2016
Floating LNG/LPG production, storage and loading units
$17.1
DNV DNVGL-RU-OU-0103
Published Date: 07/01/2015
Floating LNG/LPG production, storage and loading units
$17.1

Related products

DNV GL ADDITIONAL RULES AND GUIDELINES VI-11-10
Published Date: 07/01/2016
VI-Rules for Classification and Construction Additional Rules and Guidelines Part 11-Other Operations and Systems Chapter 10-Guidelines on Ballast Water Management
$17.1
DNV DNV-RU-SHIPS PART 6 CHAPTER 9
Published Date: 07/01/2012
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS LOADING COMPUTER SYSTEMS (LCS) FOR STABILITY AND LONGITUDINAL STRENGTH
$17.1
DNV DNV-RU-YACHT PART 7 CHAPTER 2
Published Date: 07/01/2024
Part 7 Fleet in service – retention of class - Chapter 2 Periodical surveys – main class
$17.1

Best-Selling Products

Acceptance sampling pack
Published Date: 02/01/2001
$348.996
Accuracy and precision pack
Published Date: 02/01/2001
$205.74
Achieving ISO/IEC 20000 series promotional kit
Published Date: 03/31/2006
$89.154
Action on structures
Published Date: 07/30/2010
$1045.464
Aluminium and aluminium alloys pack
Published Date: 07/15/1999
$232.41