DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10 PDF

DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10 PDF

Name:
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10 PDF

Published Date:
07/01/2019

Status:
[ Revised ]

Description:

Part 3 Hull - Chapter 10 Special requirements

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

General

Application

The requirements given in this section apply to all ships, and cover the strengthening requirements for local impact pressure that may occur in the bow area.

The bow impact pressure given in [2.1] applies to areas away from knuckles, anchor bolster etc. that may obstruct the water flow during wave impacts. In way of such obstructions, additional reinforcement of the shell plating by fitting carlings or similar shall generally be considered.

Extent of strengthening

The strengthening shall extend forward of 0.1 L from the F.E. and vertically from the minimum design ballast draught, TBAL, defined in Ch.1 Sec.4 [3.1.6] and to forecastle deck if any. See Figure 1.

If the flare angle, α as defined in [2.1.1], is greater than 40° at 0.10 L from F.E., the bow impact area shall be extended to 0.15 L from F.E.

Further, if the flare angle, α as defined in [2.1.1], is greater than 40° at 0.15 L from F.E., the bow impact area shall be extended to 0.2 L from F.E.

Aft of 0.1 L from F.E. the bow impact strengthening is only applicable for areas where the flare angle is greater than 5°.


Edition : 19
File Size : 1 file , 1.5 MB
Number of Pages : 69
Published : 07/01/2019

History

DNV DNV-RU-SHIPS PART 3 CHAPTER 10
Published Date: 07/01/2024
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 10
Published Date: 07/01/2023
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 10
Published Date: 07/01/2022
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 10
Published Date: 07/01/2021
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10
Published Date: 07/01/2020
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10
Published Date: 07/01/2019
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10
Published Date: 07/01/2018
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10
Published Date: 01/01/2018
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10
Published Date: 07/01/2017
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10
Published Date: 01/01/2017
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10
Published Date: 07/01/2016
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10
Published Date: 10/01/2015
Part 3 Hull - Chapter 10 Special requirements
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 10
Published Date: 10/01/2015
Part 3 Hull - Chapter 10 Special requirements
$17.1

Related products

DNV DNV-OS-C104
Published Date: 07/01/2024
Structural design of self-elevating units
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 12
Published Date: 07/01/2024
Part 3 Hull - Chapter 12 Openings and closing appliances
$17.1
DNV DNV-SE-0499
Published Date: 03/01/2017
Certification of pipeline components
$43.5

Best-Selling Products

USACE CEGS-07416
Published Date:
Structural Standing Seam Metal Roof (SSSMR) Systems
$6.6