DNV DNVGL-RU-SHIPS PART 3 CHAPTER 9 PDF

DNV DNVGL-RU-SHIPS PART 3 CHAPTER 9 PDF

Name:
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 9 PDF

Published Date:
10/01/2015

Status:
[ Revised ]

Description:

Part 3 Hull - Chapter 9 Fatigue

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
dnv-dnvgl-ru-ships-part-3-chapter-9_2792041

Choose Document Language:
17.10 €
Need Help?

Introduction

This chapter provides fatigue strength requirements for welds and free plate edges.

The fatigue assessment of the hull structure is based on high cycle wave induced loads, design S-N curves and Palmgren-Miner method for linear fatigue damage accumulation.

The structural details required for fatigue strength assessment are determined with consideration of ship type experience, probability of fatigue cracking and consequence of failure.


Edition : 15
File Size : 1 file , 150 KB
Number of Pages : 16
Published : 10/01/2015

History

DNV DNV-RU-SHIPS PART 3 CHAPTER 9
Published Date: 07/01/2024
Part 3 Hull - Chapter 9 Fatigue
17.10 €
DNV DNV-RU-SHIPS PART 3 CHAPTER 9
Published Date: 07/01/2021
Part 3 Hull - Chapter 9 Fatigue
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 9
Published Date: 07/01/2019
Part 3 Hull - Chapter 9 Fatigue
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 9
Published Date: 01/01/2018
Part 3 Hull - Chapter 9 Fatigue
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 9
Published Date: 10/01/2015
Part 3 Hull - Chapter 9 Fatigue
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 9
Published Date: 10/01/2015
Part 3 Hull - Chapter 9 Fatigue
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 9
Published Date: 10/01/2015
Part 3 Hull - Chapter 9 Fatigue
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 9
Published Date: 10/01/2015
Part 3 Hull - Chapter 9 Fatigue
17.10 €

Related products

DNV DNV-RU-SHIPS PART 6 CHAPTER 3
Published Date: 07/01/2011
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS - ADDITIONAL CLASS - Periodically Unattended Machinery Space
17.10 €
DNV DNV-RU-SHIPS/HSLC PART 4 CHAPTER 7
Published Date: 01/01/2012
NEWBUILDINGS MACHINERY AND SYSTEMS - MAIN CLASS - Pressure Vessels
17.10 €
DNV DNV APPROVAL PROGRAMME NO. 313
Published Date: 05/01/2011
OFFSHORE MOORING STEEL WIRE ROPES AND SOCKETS
34.20 €
DNV DNV-RU-SHIPS PART 6 CHAPTER 12
Published Date: 01/01/2014
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS - ADDITIONAL CLASS - Environmental Class
17.10 €

Best-Selling Products

UNE-CLC/TR 50373:2006 IN
Published Date: 06/07/2006
Wind turbines - Electromagnetic compatibility
UNE-CLC/TR 50453:2008 IN
Published Date: 11/26/2008
Evaluation of electromagnetic fields around power transformers
UNE-CLC/TR 50462:2009
Published Date: 10/14/2009
Rules for the determination of uncertainties in the measurement of the losses on power transformer and reactors
UNE-CLC/TR 50488:2007 IN
Published Date: 07/18/2007
Railway applications - Safety measures for the personnel working on or near overhead contact lines