DNV DNVGL-RU-YACHT PART 3 CHAPTER 4 PDF

DNV DNVGL-RU-YACHT PART 3 CHAPTER 4 PDF

Name:
DNV DNVGL-RU-YACHT PART 3 CHAPTER 4 PDF

Published Date:
01/01/2021

Status:
[ Revised ]

Description:

Part 3 Hull Chapter 4 Metallic hull girder strength and local scantlings

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
dnv-dnvgl-ru-yacht-part-3-chapter-4_2826593

Choose Document Language:
17.10 €
Need Help?
W/D S/S BY DNV-RU-YHT P 3 CH 4

This section specifies the criteria for calculating the hull girder strength characteristics, in association with the hull girder loads specified in Ch.3 Sec.3.

Sec.3 specifies the hull girder design stresses to be used for the evaluation of the scantling of structural members according to Sec.4 subject to local load and hull girder load combination.


Edition : 21
File Size : 1 file , 6 MB
Number of Pages : 167
Published : 01/01/2021

History

DNV DNV-RU-YACHT PART 3 CHAPTER 4
Published Date: 07/01/2022
Part 3 Hull - Chapter 4 Metallic hull girder strength and local scantlings
17.10 €
DNV DNV-RU-YACHT PART 3 CHAPTER 4
Published Date: 08/01/2021
Part 3 Hull - Chapter 4 Metallic hull girder strength and local scantlings
17.10 €
DNV DNVGL-RU-YACHT PART 3 CHAPTER 4
Published Date: 01/01/2021
Part 3 Hull Chapter 4 Metallic hull girder strength and local scantlings
17.10 €
DNV DNVGL-RU-YACHT PART 3 CHAPTER 4
Published Date: 10/01/2016
Part 3 Hull - Chapter 4 Metallic hull girder strength and local scantlings
DNV DNVGL-RU-YACHT PART 3 CHAPTER 4
Published Date: 10/01/2016
Part 3 Hull - Chapter 4 Metallic hull girder strength and local scantlings
DNV DNVGL-RU-YACHT PART 3 CHAPTER 4
Published Date: 10/01/2016
Part 3 Hull - Chapter 4 Metallic hull girder strength and local scantlings
17.10 €
DNV DNVGL-RU-YACHT PART 3 CHAPTER 4
Published Date: 12/01/2015
Part 3 Hull - Chapter 4 Metallic hull girder strength and local scantlings

Related products

DNV DNV-CP-0253
Published Date: 09/01/2021
Non-ferrous tubes
17.10 €
DNV DNV-RU-UWT PART 4 CHAPTER 8
Published Date: 07/01/2024
Part 4 Machinery and systems - Chapter 8 Electrical installations
17.10 €
DNV DNV CLASSIFICATION NOTES 30.9
Published Date: 08/01/2014
Sloshing Analysis of LNG Membrane Tanks
17.10 €
DNV DNV-RU-SHIPS/HSLC PART 6 CHAPTER 11
Published Date: 01/01/2011
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS - ADDITIONAL CLASS Hull Monitoring Systems

Best-Selling Products