DNV GL ADDITIONAL RULES AND GUIDELINES VI-3-11 PDF

DNV GL ADDITIONAL RULES AND GUIDELINES VI-3-11 PDF

Name:
DNV GL ADDITIONAL RULES AND GUIDELINES VI-3-11 PDF

Published Date:
03/01/2003

Status:
[ Active ]

Description:

VI-Rules for Classification and Construction Additional Rules and Guidelines Part 3-Machinery Installations Chapter 11-Guidelines for the Use of Fuel Cell Systems on Board of Ships and Boats

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

Scope of Application

1. These Guidelines apply to the use of fuel-cell systems (FC systems) permanently installed on ships and boats. They describe the technical requirements for the safe operation of FC systems. 2. In the case of FC systems which are used as the sole means of propulsion, for the emergency electrical supply or for the supply of essential consumers in accordance with the GL Construction Rules, the additional requirements will be determined within the scope of an individual examination.

3. Designs which deviate from these Guidelines or from the applicable Rules may be approved if they are examined by GL for suitability and then approved as being equivalent.

4. Deviating designs are necessary to some extent for submersibles. These can be approved by GL, especially with regard to the ventilation systems and pressure relief devices.

5. For water craft with FC systems conforming to these Guidelines and having a rated output greater than or equal to 10 % of the rated output of the machinery installation the class notation FC-xxx will be assigned. The wild-card symbol "xxx" designates the percentage share of the FC system in relation to the rated output of the machinery installation. For FC systems having a rated output lower than 10 % of the rated output of the machinery installation the class notation with FC will be assigned.


Edition : 03
File Size : 1 file , 350 KB
Number of Pages : 28
Published : 03/01/2003

History


Related products

DNV DNV-RU-SHIPS PART 6 CHAPTER 22
Published Date: 07/01/2013
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS - ADDITIONAL CLASS - Enhanced System Verification
$17.1
DNV DNV-RU-HSLC PART 6 CHAPTER 30
Published Date: 07/01/2013
SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS - Service on Windfarms and other Offshore Installations
$17.1
DNV DNV-CP-0353
Published Date: 04/01/2022
Selective catalytic reduction system
$17.1
DNV DNV-CP-0250
Published Date: 09/01/2021
Aluminium alloy castings
$17.1

Best-Selling Products