DOXPUB 04-0001-SOP PDF

DOXPUB 04-0001-SOP PDF

Name:
DOXPUB 04-0001-SOP PDF

Published Date:
08/01/2007

Status:
Active

Description:

Operation and Maintenance of the Ultrasonic Welding System

Publisher:
Doxpub, Inc.

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$29.7
Need Help?

Summary:

Provides guidelines for set-up, operation, calibration, and maintenance of the Branson ultrasonic welding system. Includes instructions for assembling the converter-booster-horn stack, installing the stack assembly, turning power on, adjusting air pressure, adjusting the stroke length, aligning the horn, adjusting the mechanical stop, adjusting the down speed, selecting weld cycle, printer settings, resetting the counter, calibrating the actuator, and general operation and maintenance.

Included Sections:

Purpose, Scope, Responsibility, References and Applicable Documents, Materials and Equipment, Health and Safety Considerations, Documentation Requirements, and Procedures

Included Attachments/Appendices:

Ultrasonic Welding Equipment Use Logsheet

About This Document:

This is not a generic template, it's a 10-page procedure that was actually created and used in the Device Engineering operations of a FDA-regulated establishment. The company-specific information (names, addresses, some images, proprietary product information, etc.) has been redacted but the content and format have been largely preserved.

Reasons to Buy:

  • Use it as a starting point for your own documentation project
  • Compare the quality of your documents against your industry peers
  • Learn what other companies in your industry are actually doing

Who Will Benefit:

  • Engineering Development Personnel
  • Device QC Personnel
  • Device Manufacturing Personnel

Edition : 1.0
File Size : 1 file , 500 KB
Number of Pages : 10
Published : 08/01/2007

History


Related products

DOXPUB 11-0004-SOP
Published Date: 08/01/2007
Fume Hood Operation and Maintenance
$11.7
DOXPUB 11-0007-SOP
Published Date: 08/01/2007
Operation and Maintenance of The Lytzen Class 100 Dry Heat Sterilizer
$17.7
DOXPUB 11-0021-SOP
Published Date: 08/01/2007
A&D and Mettler Toledo Balances Accuracy Check and Use
$29.7
DOXPUB 11-0045-SOP
Published Date: 08/01/2007
Operation and Maintenance of a Manufacturing and Development Facility De-ionized (DI) Water System
$38.7

Best-Selling Products