DOXPUB 11-0019-SOP PDF

DOXPUB 11-0019-SOP PDF

Name:
DOXPUB 11-0019-SOP PDF

Published Date:
08/01/2007

Status:
Active

Description:

Preparation of Carboys and Pressure Vessels (Over 20 Liters)

Publisher:
Doxpub, Inc.

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$8.7
Need Help?

Summary:

Describes procedures for preparing carboys and pressure vessels (over 20 liters) and setting process time limits prior to autoclaving. Applicable to carboys and pressure vessels over 20 liters used for the manufacturing of buffer solutions, Gel, and antibody.

Included Sections:

Purpose, Scope, Responsibility, References and Applicable Documents, Materials and Equipment, Health and Safety Considerations, Documentation Requirements, and Procedures

Included Attachments/Appendices:

None

About This Document:

This is not a generic template, it's a 3-page procedure that was actually created and used in the Facilities & Equipment operations of a FDA-regulated establishment. The company-specific information (names, addresses, some images, proprietary product information, etc.) has been redacted but the content and format have been largely preserved.

Reasons to Buy:

  • Use it as a starting point for your own documentation project
  • Compare the quality of your documents against your industry peers
  • Learn what other companies in your industry are actually doing

Who Will Benefit:

  • Manufacturing Personnel
  • Facilities Managers
  • Laboratory Personnel

Edition : 1.0
File Size : 1 file , 290 KB
Number of Pages : 3
Published : 08/01/2007

History


Related products

DOXPUB 11-0037-SOP
Published Date: 08/01/2007
Cold Rooms & Walk-In Freezer - Operation and Maintenance
$14.7
DOXPUB 02-0054-SOP
Published Date: 08/01/2007
Operation and Maintenance of the Beckman GPR Tabletop Centrifuge
$8.7
DOXPUB 11-0012-SOP
Published Date: 08/01/2007
VERSA Minicutter
$14.7
DOXPUB 11-0029-SOP
Published Date: 08/01/2007
Operation and Maintenance of the Clean Nitrogen System
$20.7

Best-Selling Products

HIR FTV RP 2007
Published Date: 03/01/2018
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels
$69
HIR FTV RP 2007
Published Date: 01/03/2023
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels, Recommended Practice 2007(c)
$79.5
HIR Publication 2023
Published Date: 12/31/2023
A publication providing insights into the methods used to repair small, existing, shop-fabricated steel Above-ground, Atmospheric Pressure, Vented, Tanks designed and used for Petroleum and Non- Petroleum storage
$47.7