Name:
DOXPUB 11-0050-SOP PDF
Published Date:
08/01/2007
Status:
Active
Publisher:
Doxpub, Inc.
Summary:
Describes procedure to management, control and assure timely reporting of changes to facilities systems. Applicable to all validated and non-validated systems and equipment for which Facilities is responsible for maintenance and repair that are integral to the facility. Does not apply to portable bench equipment. Includes provisions for assigning facilities change request (FCR) numbers, FCR assessment, FCR approval, and FCR completion.
Included Sections:
Purpose, Scope, Responsibility, References and Applicable Documents, Materials and Equipment, Health and Safety Considerations, Documentation Requirements, and Procedures
Included Attachments/Appendices:
Facility Change Request Form
About This Document:
This is not a generic template, it's a 5-page procedure that was actually created and used in the Facilities & Equipment operations of a FDA-regulated establishment. The company-specific information (names, addresses, some images, proprietary product information, etc.) has been redacted but the content and format have been largely preserved.
Reasons to Buy:
Who Will Benefit:
| Edition : | 1.0 |
| File Size : | 1 file , 350 KB |
| Number of Pages : | 5 |
| Published : | 08/01/2007 |