Name:
DOXPUB 12-0065-SOP PDF
Published Date:
08/01/2007
Status:
Active
Publisher:
Doxpub, Inc.
Summary:
Describes a procedure for tracking device development projects as they move through five stages from Preliminary Review to Product Launch. Applies to all projects tracked under the design control system. Includes provisions for establishing a deliverables checklist, changing deliverables, handling incomplete deliverables, fulfilling deliverables, completing development stage, defining deliverables, and compliance with ISO 9001.
Included Sections:
Purpose, Scope, Responsibility, References and Applicable Documents, Materials and Equipment, Health and Safety Considerations, Documentation Requirements, and Procedures
Included Attachments/Appendices:
Preliminary Review Deliverables Checklist, Feasibility Deliverables Checklist, Development Deliverables Checklist, Clinical Trials Deliverables (Clinical Grade Production), Product Launch Deliverables, Project Stage Transfer Form
About This Document:
This is not a generic template, it's a 14-page procedure that was actually created and used in the Device Engineering operations of a FDA-regulated establishment. The company-specific information (names, addresses, some images, proprietary product information, etc.) has been redacted but the content and format have been largely preserved.
Reasons to Buy:
Who Will Benefit:
| Edition : | 1.0 |
| File Size : | 1 file , 760 KB |
| Number of Pages : | 14 |
| Published : | 08/01/2007 |