ECIA IS-722 PDF

ECIA IS-722 PDF

Name:
ECIA IS-722 PDF

Published Date:
05/01/1997

Status:
[ Active ]

Description:

Low-Voltage Supplemental Fuse Qualification Specification

Publisher:
Electronic Components Industry Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$30.3
Need Help?
SEE EIA SP 4357

Description

This specification defines the qualification program for low voltage, supplemental fuses. Fuses covered will be limited to axial-leaded, radial-leaded and surface mount configurations having a current rating of no greater than 60 A, maximum voltage rating of 600 VAC/DC and interrupting rating of 10,000 A maximum. The qualification program is defined in table 1, and the flow diagram. Specification sheets can be added, as required, to define specific products or to cover unique / specific requirements. This document does not relieve the suppliers of their responsibility to maintain their own company's internal qualification program and the fuses shall continue to meet all applicable requirements of UL 248-14 / CSA-C22.2 NO. 248.14.

Three types of fuses are covered in this specification. They include:

Type I - The type I fuse is designed to operate (open) within a given time period at 200% overload. The remainder of this specification is written with the 200% overload test used as the standard.

Type II - The type II fuse is designed to operate (open) within a given time period at 250% overload. For a Type II fuse, the 250% overload shall be substituted throughout this specification where 200% overload is noted. All other requirements shall continue to be met.

Type III - The type III fuse is designed to operate (open) within a given time period at 300% overload. For a Type III fuse, the 300% overload shall be substituted throughout this specification where 200% overload is noted. All other requirements shall continue to be met.

Preconditioning

This process is intended to simulate exposure to the thermal and cleaning environments of the assembly process before qualification testing. The component assembly process simulation requirements for different types of processes are described in annex A.


Edition : 97
File Size : 0 files
Number of Pages : 31
Published : 05/01/1997

History


Related products

ECIA EIA-552
Published Date: 01/01/1989
EIA Standards for Electron Tubes
$60.9
ECIA EIA-364-105B
Published Date: 01/01/2015
TP-105B Altitude – Low Temperature Test Procedure for Electrical Connectors and Sockets
$23.4
ECIA EIA-364-26C
Published Date: 03/01/2014
TP-26C Salt Spray Test Procedure for Electrical Connectors, Contacts and Sockets
$25.5
ECIA EIA-724
Published Date: 09/01/1997
Product Life Cycle Data Model
$24.3

Best-Selling Products

LPI 175
Published Date: 01/01/2008
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2008 Edition
LPI 175
Published Date: 2011
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2011 Edition
$14.7
LPI 175
Published Date: 2014
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2014 Edition
$14.7