ASSE (Plumbing) 1015-2021 PDF

ASSE (Plumbing) 1015-2021 PDF

Name:
ASSE (Plumbing) 1015-2021 PDF

Published Date:
06/01/2021

Status:
Active

Description:

Performance Requirements for Double Check Backflow Prevention Assemblies

Publisher:
American Society of Sanitary Engineering

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.5
Need Help?

The purpose of Double Check Backflow Prevention Assemblies (DC) is to keep polluted water from flowing into a potable water distribution system when some abnormality in the system causes the pressure to be temporarily higher in the polluted part of the system than in the potable water supply piping. These assemblies consist of 2 independently acting check valves, internally force loaded to a normally closed position, 2 properly located tightly closing shut-off valves per Section 1.3.2.6 and properly located test cocks per Section 1.3.2.4. These assemblies are designed and constructed to operate under intermittent or continuous pressure conditions.


ANSI : ANSI Approved
File Size : 1 file , 1.3 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 28
Published : 06/01/2021

History

ASSE (Plumbing) 1015-2021
Published Date: 06/01/2021
Performance Requirements for Double Check Backflow Prevention Assemblies
$13.5
ASSE (Plumbing) 1015-2009
Published Date: 07/01/2009
Performance Requirements for Double Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies
$13.5

Related products


Best-Selling Products

SN-CEN ISO/ASTM/TS 52930:2021
Published Date: 12/16/2021
Additive Manufacturing - Qualification principles - Installation, operation and performance (IQ/OQ/PQ) of PBF-LB equipment (ISO/ASTM/TS 52930:2021)