ETSI ETR 280 PDF

ETSI ETR 280 PDF

Name:
ETSI ETR 280 PDF

Published Date:
03/01/1996

Status:
Active

Description:

Business TeleCommunications (BTC); Private Integrated Services Network (PISN); Private User Mobility (PUM); Impact of PUM on the PISN

Publisher:
European Telecommunications Standards Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$33.69 32.70 you save 0.99
Need Help?
To cover the impact of implementing PUM on standardised services within the existing PISN.
Edition : 1
File Size : 1 file , 140 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 35
Published : 03/01/1996

History


Related products

ETSI EN 300 607-4
Published Date: 09/01/2000
Digital cellular telecommunications system (Phase 2+) (GSM); Mobile Station (MS) conformance specification; Part 4: SIM Application Toolkit conformance specification (GSM 11.10-4 version 5.1.1 Release 1996)
87.20 84.73 you save 2.47
ETSI TR 101 198
Published Date: 09/01/1997
Digital Video Broadcasting (DVB); Implementation of Binary Phase Shift Keying (BPSK) modulation in DVB satellite transmission systems
$4.164
ETSI TS 148 020
Published Date: 08/01/2020
Digital cellular telecommunications system (Phase 2+) (GSM); Rate adaption on the Base Station System - Mobile-services Switching Centre (BSS - MSC) interface (3GPP TS 48.020 version 16.0.0 Release 16)
$9.81

Best-Selling Products

CMAA 70-04
Published Date: 01/01/2004
Specifications for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2010
Published Date: 2010
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2020
Published Date: 2020
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
$31.5
CMAA 74-2004
Published Date:
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2010
Published Date: 2010
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2020
Published Date: 2020
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
$31.5