ETSI GTS GSM 02.79 PDF

ETSI GTS GSM 02.79 PDF

Name:
ETSI GTS GSM 02.79 PDF

Published Date:
03/01/1999

Status:
Active

Description:

Digital cellular telecommunications system (Phase 2+) (GSM); Support of Optimal Routeing (SOR); Service definition (Stage 1) (GSM 02.79 version 5.2.0 Release 1996)

Publisher:
European Telecommunications Standards Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$21.80 21.31 you save 0.49
Need Help?
This Stage 1 is a description of the first phase of Support of Optimal Routing (SOR): - compiles the basic service requirements for SOR; - describes the interactions for Supplementary Services (SS) in order to cater for SOR; - refers to modifications to network features required by SOR. This Global System for Mobile communications Technical Specification ( GTS) does not address the following: - There is no need for optimization of the routing of calls originally directed to a fixed network subscriber, because the physical address of a fixed network terminating line cannot differ from its logical add ress. - SOR in non-GSM mobile networks is not a subject of this GTS, but mig ht be possible by bilateral arrangement between GSM network operators and those non-GSM mobile network operators. The purpose of SOR is to reduce the number of unnecessary inter-PLMN c all legs. The first phase of SOR applies to: - OR performed within a country (i.e. Mobile to mobile calls where bot h mobile subscribers are located in the same country); - OR performed towards the country where the call would have normally been routed without OR (e.g. Conditional Call Forwarding towards the H ome Country of the called party). The complete set of scenarios included in the phase 1 of OR is present ed in the paragraph for normal procedures. All other scenarios are exc luded from Phase 1 of OR. Note that Optimal Routing is applicable to national roaming situations , that is to calls directed to a mobile subscriber roaming in her home country, but registered in a PLMN different from her HPLMN. All further call scenarios, including multiple call forwarding, are le ft to subsequent phases of SOR. Subsequent phases of SOR shall be back wards compatible with this first phasd.
Edition : 5.2.0
File Size : 1 file , 66 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 18
Published : 03/01/1999

History

ETSI GTS GSM 02.79
Published Date: 03/01/1999
Digital cellular telecommunications system (Phase 2+) (GSM); Support of Optimal Routeing (SOR); Service definition (Stage 1) (GSM 02.79 version 5.2.0 Release 1996)
21.80 21.31 you save 0.49
ETSI GTS GSM 02.79
Published Date: 11/01/1996
Digital cellular telecommunications system (Phase 2+) (GSM); Support of Optimal Routeing (SOR); Service definition, Stage 1 (GSM 02.79)
21.80 21.31 you save 0.49
ETSI GTS GSM 02.79
Published Date: 07/01/1996
Digital cellular telecommunications system (Phase 2+) (GSM); Support of Optimal Routeing (SOR); Service definition, Stage 1 (GSM 02.79)
21.80 21.31 you save 0.49

Related products

ETSI EN 301 811-1-2
Published Date: 01/01/2001
Broadband Radio Access Networks (BRAN); HIPERLAN Type 2; Conformance testing for the packet based convergence layer; Part 1: Common part; Sub-part 2: Test Suite Structure and Test Purposes (TSS&TP) specification
17.83 17.34 you save 0.49
ETSI TS 128 706
Published Date: 08/01/2020
Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; IP Multimedia Subsystem (IMS) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions (3GPP TS 28.706 version 16.0.0 Release 16)
$9.81
ETSI TS 136 521-3
Published Date: 11/01/2020
LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) conformance specification; Radio transmission and reception; Part 3: Radio Resource Management (RRM) conformance testing (3GPP TS 36.521-3 version 16.6.0 Release 16)
$9.81

Best-Selling Products

FCI 13-1-2022
Published Date: 2022
Determining Condensate Loads to Size Steam Traps
$66
FCI 15-1-2020
Published Date: 2020
Standard for Production Testing of Pressure Regulators
$49.5
FCI 17-1-2018
Published Date: 10/01/2018
Standard for Production Testing of Sanitary Pressure Regulators
$33
FCI 18-1-2021
Published Date: 2021
Standard for Sizing and Selection of Type 1 Secondary Pressure Drainers
$33
FCI 18-2-2020
Published Date: 2020
Standard for Installation of Type 1 Secondary Pressure Drainers
$33