ETSI TS 101 377-1-3 PDF

ETSI TS 101 377-1-3 PDF

Name:
ETSI TS 101 377-1-3 PDF

Published Date:
03/01/2001

Status:
Active

Description:

GEO-Mobile Radio Interface Specifications; Part 1: General specifications; Sub-part 3: GMR-2 General System Requirements; GMR-2 01.202

Publisher:
European Telecommunications Standards Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
etsi-ts-101-377-1-3_954507

Choose Document Language:
0
Need Help?
An overview of GMR-2 general system requirements.
Edition : 1.1.1
File Size : 1 file , 170 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 16
Published : 03/01/2001

History


Related products

ETSI EN 302 405
Published Date: 08/01/2000
Digital cellular telecommunications system (Phase 2+) (GSM); GSM Cordless Telephony System (CTS), Phase 1; CTS Architecture Description; Stage 2 (GSM 03.56 version 7.1.1 Release 1998)
ETSI TR 101 365
Published Date: 07/01/1998
Intelligent Network (IN); IN interconnect threat analysis
ETSI TS 101 377-1-2
Published Date: 03/01/2001
GEO-Mobile Radio Interface Specifications; Part 1: General specifications; Sub-part 2: Introduction to the GMR-2 family of specifications; GMR-2 01.201
ETSI TS 101 377-4-9
Published Date: 03/01/2001
GEO-Mobile Radio Interface Specifications; Part 4: Radio interface protocol specifications; Sub-part 9: Performance requirements on the mobile radio interface; GMR-2 04.013

Best-Selling Products

APA 3D-001
Published Date: 11/01/2006
APA Full-Scale House Test Project: Progress Report 1
APA 3D-002
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 2
APA 3D-003
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 3
APA 3D-004
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 4
APA 3D-005
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 5
APA 3D-007
Published Date: 01/01/2007
APA Full-Scale House Test Project: Progress Report 7