ETSI TS 129 389 PDF

ETSI TS 129 389 PDF

Name:
ETSI TS 129 389 PDF

Published Date:
05/01/2017

Status:
Active

Description:

LTE; Inter-V2X Control Function Signalling aspects (V6); Stage 3 (3GPP TS 29.389 version 14.0.0 Release 14)

Publisher:
European Telecommunications Standards Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9.81
Need Help?
ETSI TS 129 389 describes the Diameter-based interfaces between the V2X Control Function in the HPLMN and the V2X Control Function in the VPLMN (V6 interface).

This specification defines the Diameter application for V6 reference points between the V2X Control Functions. The interactions between the V2X Control Functions are specified.

The stage 2 description for V2X service features in EPS is specified in 3GPP TS 23.285 [2].
Edition : 14.0.0
File Size : 1 file , 240 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 22
Published : 05/01/2017

History

ETSI TS 129 389
Published Date: 11/01/2020
LTE; Inter-V2X Control Function Signalling aspects (V6); Stage 3 (3GPP TS 29.389 version 16.0.0 Release 16)
$9.81
ETSI TS 129 389
Published Date: 10/01/2019
LTE; Inter-V2X Control Function Signalling aspects (V6); Stage 3 (3GPP TS 29.389 version 15.1.0 Release 15)
$9.81
ETSI TS 129 389
Published Date: 10/01/2019
LTE; Inter-V2X Control Function Signalling aspects (V6); Stage 3 (3GPP TS 29.389 version 14.2.0 Release 14)
$9.81
ETSI TS 129 389
Published Date: 07/01/2017
LTE; Inter-V2X Control Function Signalling aspects (V6); Stage 3 (3GPP TS 29.389 version 14.1.0 Release 14)
$9.81
ETSI TS 129 389
Published Date: 05/01/2017
LTE; Inter-V2X Control Function Signalling aspects (V6); Stage 3 (3GPP TS 29.389 version 14.0.0 Release 14)
$9.81

Related products

ETSI TS 101 297
Published Date: 03/01/2000
Digital cellular telecommunications system (Phase 2+) (GSM); General Packet Radio Service (GPRS); Mobile Station (MS) - Serving GPRS Support Node (SGSN); Subnetwork Dependent Convergence Protocol (SNDCP) (GSM 04.65 version 8.0.0 Release 1999)
41.62 40.62 you save 1.00

Best-Selling Products

IEC/TR 60034-16-2 Ed. 1.0 b:1991
Published Date: 02/15/1991
Rotating electrical machines - Part 16: Excitation systems for synchronous machines - Chapter 2: Models for power system studies
$88.746
IEC/TR 60068-3-12 Ed. 2.0 b:2014
Published Date: 10/17/2014
Environmental testing - Part 3-12: Supporting documentation and guidance - Method to evaluate a possible lead-free solder reflow temperature profile
$39.9
IEC/TR 60068-3-12 Ed. 3.0 en:2022
Published Date: 10/01/2022
Environmental testing - Part 3-12: Supporting documentation and guidance - Method to evaluate a possible lead-free solder reflow temperature profile
$83.4
IEC/TR 60068-3-15 Ed. 1.0 en:2024
Published Date: 02/01/2024
Environmental testing – Part 3-15: Supporting documentation and guidance – Vacuum-assisted reflow soldering
$70.2
IEC/TR 60068-3-82 Ed. 1.0 en:2024
Published Date: 08/01/2024
Environmental testing – Part 3-82: Supporting documentation and guidance – Confirmation of the performance of whisker test method
$115.8
IEC/TR 60071-4 Ed. 1.0 en:2004
Published Date: 06/23/2004
Insulation co-ordination - Part 4: Computational guide to insulation co-ordination and modelling of electrical networks
$136.5