EUROCAE ED-240B PDF

EUROCAE ED-240B PDF

Name:
EUROCAE ED-240B PDF

Published Date:
07/01/2023

Status:
[ Active ]

Description:

MINIMUM AVIATION SYSTEM PERFORMANCE STANDARD FOR REMOTE TOWER OPTICAL SYSTEMS

Publisher:
European Organization for Civil Aviation Equipment

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$31.2
Need Help?

Scope of this Document

This document comprises a MASPS for RTOSs, optionally augmented with visual tracking-based object motion indications, automatic PTZ (Pan-Tilt-Zoom) object-following functionality, and non-optical surveillance sensors. It is thus applicable to four main building blocks:

(1) Optical System

This MASPS specifies the end-to-end performance of the RTOS comprising the whole “glass-to-glass” chain from the optical sensor(s) to the Optical Sensor Presentation (OSP) (that is, a Visual Presentation that displays optical sensor video images without object overlays; see §1.5.5). It is applicable to all optical sensor configurations that could be used to provide the operator with aerodrome visual surveillance information. The specific configuration of the optical system is a matter for individual implementations.

(2) Visual Tracking (optional)

Moving objects can optionally be augmented by overlaying information onto the OSP video images (typically a box-shaped symbol) to support operator situational awareness. This MASPS specifies the end-to-end performance of such an optical sensor-based Visual Tracking function comprising the whole chain from the optical sensor(s) to the OSP, which then becomes an Augmented OSP.

(3) PTZ Object Following (optional)

A conventional tower must be equipped with binoculars to provide a close-up view of objects. This requirement is satisfied in an RTOS by a mandatory Pan-Tilt-Zoom (PTZ) camera function. Additionally, an optional PTZ Object Following Function may be implemented to automatically orientate the PTZ camera to keep a targeted moving object near the centre of its view. This MASPS specifies the end-to-end performance of such a PTZ Object Following function comprising the whole chain from the optical sensor(s) to the Visual Presentation.

(4) Non-Optical Surveillance Sensors (optional)

The OSP can optionally be augmented by the integration of information from non-optical Surveillance Sensors. This MASPS addresses operational considerations on the integration of surveillance information from non-optical sensors into the OSP and its optical sensor-associated functions such as PTZ Object Following.


Edition : B
File Size : 1 file , 3 MB
Number of Pages : 104
Published : 07/01/2023

History

EUROCAE ED-240B
Published Date: 07/01/2023
MINIMUM AVIATION SYSTEM PERFORMANCE STANDARD FOR REMOTE TOWER OPTICAL SYSTEMS
$31.2
EUROCAE ED-240A
Published Date: 10/01/2018
MINIMUM AVIATION SYSTEM PERFORMANCE STANDARD FOR REMOTE TOWER OPTICAL SYSTEMS
EUROCAE ED-240
Published Date: 09/01/2016
MINIMUM AVIATION SYSTEM PERFORMANCE SPECIFICATION FOR REMOTE TOWER OPTICAL SYSTEMS

Related products

EUROCAE ED-318
Published Date: 01/01/2024
TECHNICAL SPECIFICATION FOR GEOGRAPHICAL ZONES AND U-SPACE DATA PROVISION AND EXCHANGE
$38.4
EUROCAE ED-286
Published Date: 03/01/2021
OPERATIONAL SERVICES AND ENVIRONMENT DEFINITION FOR COUNTER-UAS IN CONTROLLED AIRSPACE
$34.2
EUROCAE ED-219
Published Date: 02/01/2013
AIRCRAFT FUEL CELL SAFETY GUIDELINES
$42.3
EUROCAE ED-30
Published Date: 03/01/1980
MINIMUM PERFORMANCE SPECIFICATION FOR AIRBORNE LOW RANGE RADIO (RADAR) ALTIMETER EQUIPMENT
$16.2

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138