FAA 78 FR 76772 PDF

FAA 78 FR 76772 PDF

Name:
FAA 78 FR 76772 PDF

Published Date:
12/19/2013

Status:
[ Active ]

Description:

Special Conditions: Airbus Model A350-900 Airplanes; Permanently Installed Rechargeable Lithium-Ion Batteries And Battery Systems

Publisher:
Federal Aviation Administration

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?

SUMMARY:

This action proposes special conditions for Airbus Model A350–900 series airplanes. These airplanes will have a novel or unusual design feature associated with permanently installed rechargeable lithium-ion batteries and battery systems. These batteries have certain failure, operational, and maintenance characteristics that differ significantly from those of the nickelcadmium and lead-acid rechargeable batteries currently approved for installation on large transport-category airplanes. The applicable airworthiness regulations do not contain adequate or appropriate safety standards for this design feature. These proposed special conditions contain the additional safety standards that the Administrator considers necessary to establish a level of safety equivalent to that established by the existing airworthiness standards.


Edition : 13
File Size : 1 file , 110 KB
Number of Pages : 4
Published : 12/19/2013

History


Related products

FAA 70 FR 18452A
Published Date: 04/11/2005
Metallic Materials Properties Development and Standardization (MMPDS) Handbook
$8.4
FAA FO 1600.6C
Published Date: 04/16/1993
1600.6 PHYSICAL SECURITY MANAGEMENT PROGRAM
$18.3
FAA FO JO 1900.47B
Published Date: 12/01/2006
Air Traffic Organization Operational Contingency Plan
$10.5
FAA TSO C54
Published Date: 10/15/1961
Stall Warning Instruments
$8.7

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138