FORD ESB-M4D279-A PDF

FORD ESB-M4D279-A PDF

Name:
FORD ESB-M4D279-A PDF

Published Date:
01/28/2005

Status:
[ Revised ]

Description:

LAMINATE, POLYVINYL FLOURIDE POLYVINYL CHLORIDE - METAL ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?

The material defined by this specification is a composite of clear weatherable, ultraviolet absorbing, polyvinyl fluoride (PVF) film, and a pigmented polyvinyl chloride (PVC) film, laminated to a metal substrate.


Edition : 05
File Size : 1 file , 74 KB
Number of Pages : 4
Published : 01/28/2005

History

FORD ESB-M4D279-A
Published Date: 07/28/2009
LAMINATE, POLYVINYL FLOURIDE POLYVINYL CHLORIDE - METAL ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD ESB-M4D279-A
Published Date: 01/28/2005
LAMINATE, POLYVINYL FLOURIDE POLYVINYL CHLORIDE - METAL ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD ESB-M4D279-A
Published Date: 04/26/1978
LAMINATE, POLYVINYL FLUORIDE - POLYVINYL CHLORIDE - METAL
$9

Related products

FORD WSS-M1H729-A
Published Date: 12/03/2008
FABRIC, VENICE PATTERN, WOVEN JACQUARD, UNLAMINATED ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSF-M6A69-A7
Published Date: 09/30/2003
COPPER GRAPHITE ELECTRIC MOTOR BRUSH MATERIAL, 13-110 MICRO OHMS.CM RESISTIVITY ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M99P6-C1
Published Date: 01/12/2022
CERAMIC COATING PERFORMANCE REQUIREMENTS, FLOAT LAMINATED GLASS FOR WINDSHIELD
$9
FORD WE 100
Published Date: 09/28/2012
HEXAGON NUTS ALL METAL PREVAILING TORQUE TYPE PC 8 - THREAD CLASS 6H CATEGORY 200.030
$9

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138