FORD ESB-M99D55-A1 PDF

FORD ESB-M99D55-A1 PDF

Name:
FORD ESB-M99D55-A1 PDF

Published Date:
11/28/2006

Status:
[ Revised ]

Description:

TUBING, POLYOLEFIN - HEAT SHRINKABLE - DUAL***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ford-esb-m99d55-a1_2865262

Choose Document Language:
9.00 €
Need Help?

The material defined by these specifications is a selectively cross-linked dual wall polyolefin tubing whose diameter shall reduce to a predetermined size upon application of heat in excess of 121 °C. The tubing shall be fabricated from an irradiated, thermally stabilized, modified polyolefin composition, and shall be lined with a thermoplastic adhesive.


Edition : 06
File Size : 1 file , 85 KB
Number of Pages : 3
Published : 11/28/2006

History

FORD ESB-M99D55-A1
Published Date: 07/04/2013
TUBING, POLYOLEFIN - HEAT SHRINKABLE - DUAL WALL - ADHESIVELY LINED - FLEXIBLE ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD ESB-M99D55-A1
Published Date: 11/28/2006
TUBING, POLYOLEFIN - HEAT SHRINKABLE - DUAL***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD ESB-M99D55-A1
Published Date: 06/25/2001
TUBING, POLYOLEFIN - HEAT SHRINKABLE - DUAL WALL - ADHESIVELY LINED - FLEXIBLE
9.00 €

Related products

FORD WSE-M4G323-A4
Published Date: 06/03/2020
SEALANT, SILICONE RUBBER, OXIME CURED, LOW VISCOSITY ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WTX
Published Date: 06/01/1994
GROUNDING WELDING TRANSFORMERS - REACTIR METHOD
9.00 €
FORD WSS-M1J215-A
Published Date: 05/09/2022
ENAMEL, AIR DRYING, WATER REDUCIBLE, LOW GLOSS BLACKOUT, LOW VOC ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD FLTM BL 105-01
Published Date: 08/22/2001
RAPID METHOD TO PREDICT THE EFFECTIVENESS OF INHIBITED COOLANTS IN ALUMINUM HEAT EXCHANGERS
9.00 €

Best-Selling Products

NHS C 19-1:2020
Published Date: 07/06/2020
COVID-19 — Part 1: Infection control specifications for building and construction sites — The Federation of Norwegian Construction Industries (BNL) — Rev.3
NHS C 19-2:2020
Published Date: 11/09/2020
COVID-19 — Part 2: Infection control measures at concerts and events — Rev.1
NHS C 19-3:2020
Published Date: 11/05/2020
COVID-19 — Part 3: Infection control measures for cleaning companies — Rev.1
NHS C 19-5:2020
Published Date: 11/01/2020
COVID-19 — Part 5: Infection control measures for the automotive sector — Rev.3
NHS C 19-6-1:2020
Published Date: 11/24/2020
COVID-19 — Part 6-1: Specified infection control measures for retail in the city of Oslo — Rev.1
NHS C 19-6:2020
Published Date: 11/23/2020
COVID-19 — Part 6: Infection control measures for retail — Rev.1