FORD ESF-M4L4-A PDF

FORD ESF-M4L4-A PDF

Name:
FORD ESF-M4L4-A PDF

Published Date:
11/08/2012

Status:
[ Inactive ]

Description:

MAGNET, PERMANENT ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ford-esf-m4l4-a_2845354

Choose Document Language:
9.00 €
Need Help?
INACTIVE FOR NEW DESIGN

The material defined by this specification is an iron-cobalt elongated single domain fine particle magnetic material physically dispersed in a non-magnetic (lead) matrix that can be magnetized to produce a permanent magnet.


Edition : 12
File Size : 1 file , 35 KB
Number of Pages : 2
Published : 11/08/2012

History

FORD ESF-M4L4-A
Published Date: 11/08/2012
MAGNET, PERMANENT ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD ESF-M4L4-A
Published Date: 07/23/2003
MAGNET, PERMANENT ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD ESF-M4L4-A
Published Date: 03/20/1985
MAGNET, PERMANENT
9.00 €

Related products

FORD WRS-M1H1325-A23
Published Date: 02/26/2021
FABRIC, DIRECTIONAL HILO PATTERN, FLAT WOVEN, RECYCLED, PIR/PCR CONTENT WITH SOIL REPELLANT AND BACKCOATING ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSD-M2D378-A7
Published Date: 08/31/2016
THERMOPLASTIC ELASTOMER (TEO) POLYOLEFIN, EPDM RUBBER MODIFIED 87 DUROMETER A HARDNESS ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD ESF-M4D216-A
Published Date: 07/28/2009
NYLON (TYPE 612) MOLDING COMPOUND, HEAT RESISTANT ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSS-M1H856-A
Published Date: 12/04/2008
FABRIC, SIMON PATTERN, WEFT KNITTED, UNLAMINATED ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €