FORD WSA-M1A308-A1 PDF

FORD WSA-M1A308-A1 PDF

Name:
FORD WSA-M1A308-A1 PDF

Published Date:
05/31/1989

Status:
[ Revised ]

Description:

TUBING, WELDED LOW CARBON STEEL

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?

1. SCOPE:

These specifications define tubing manufactured by forming steel strip into a cylindrical form and copper brazing in a reduction atmosphere, or by electric welding steel strip.


Edition : 89
File Size : 1 file , 17 KB
Number of Pages : 4
Published : 05/31/1989

History

FORD WSA-M1A308-A1
Published Date: 07/22/2002
TUBING, WELDED LOW CARBON STEEL ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSA-M1A308-A1
Published Date: 05/31/1989
TUBING, WELDED LOW CARBON STEEL
$9

Related products

FORD WSB-M2G373-A
Published Date: 10/17/2016
ADHESIVE, HEM FLANGE, ALUMINUM BONDING, TWO COMPONENT 150 - 180 MINUTE GEL POINT, 70 - 90 °C GEL POINT ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSK-M4D622-A
Published Date: 01/08/2010
POLYBUTYLENE TEREPHTHALATE (PBT) IMPACT MODIFIED, 45 % GLASS FIBRE REINFORCEDMOLDING COMPOUND ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSF-M4D600-A
Published Date: 10/08/2010
AROMATIC POLYESTER (ARP), 30 % GLASS FIBER REINFORCED ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD ESL-M2P122-A7
Published Date: 01/06/1987
PAINT PERFORMANCE, TRUCK WHEELS ***TO BE USED WITH FORD WSS-M99P1111-A***
$9

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1