FORD WSH-M2A144-A PDF

FORD WSH-M2A144-A PDF

Name:
FORD WSH-M2A144-A PDF

Published Date:
04/17/2019

Status:
[ Not for New Design ]

Description:

ALUMINUM BRAZING SHEET - BRAZE ALLOY CLAD ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ford-wsh-m2a144-a_2810855

Choose Document Language:
9.00 €
Need Help?
INACTIVE FOR NEW DESIGN

The material defined by this specification is an aluminum sheet clad with brazing alloy on one or both sides.


Edition : 19
File Size : 1 file , 24 KB
Number of Pages : 2
Published : 04/17/2019

History

FORD WSH-M2A144-A
Published Date: 04/17/2019
ALUMINUM BRAZING SHEET - BRAZE ALLOY CLAD ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSH-M2A144-A
Published Date: 09/18/2003
ALUMINUM BRAZING SHEET - BRAZE ALLOY CLAD ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSH-M2A144-A
Published Date: 05/26/1989
ALUMINUM BRAZING SHEET - BRAZE ALLOY CLAD
9.00 €

Related products

FORD ESL-M4D197-A2
Published Date: 06/08/2012
POLYETHYLENE, HIGH DENSITY BLOW MOLDING COMPOUND, GASOLINE RESISTANT ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD FLTM BU 001-01
Published Date: 11/10/2000
MOISTURE VAPOR TRANSMISSION RATE OF WATERPROOF TAPE
9.00 €

Best-Selling Products

SNV RFC 7723
Published Date: 01/01/2016
Port Control Protocol (PCP) Anycast Addresses
9.60 €
SNV SIA 196*SN 531196
Published Date: 11/01/1998
Baulueftung im Untertagbau
44.70 €
SNV SIA 196
Published Date: 11/01/1998
Ventilation des chantiers souterrains
44.70 €
SNV SIA 197/1*SN 505197/1
Published Date: 10/01/2004
Projektierung Tunnel Bahntunnel
38.40 €
SNV SIA 197/2*SN 505197/2
Published Date: 10/01/2004
Projektierung Tunnel Strassentunnel
38.40 €
SNV SIA 197*SN 505197
Published Date: 10/01/2004
Projektierung Tunnel Grundlagen
41.10 €