FORD WSS-M2P177-C1 PDF

FORD WSS-M2P177-C1 PDF

Name:
FORD WSS-M2P177-C1 PDF

Published Date:
05/21/2009

Status:
[ Revised ]

Description:

PAINT PERFORMANCE, METAL SUBSTRATES, LOW VISIBILITY, 3 WEEK RESISTANCE ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?

These specifications define the minimum performance requirements for a protective finish for chassis and engine components. These parts are generally not top coated at the assembly plant.


Edition : 09
File Size : 1 file , 23 KB
Number of Pages : 3
Published : 05/21/2009

History

FORD WSS-M2P177-C1
Published Date: 08/05/2022
PAINT PERFORMANCE, METAL SUBSTRATES, LOW VISIBILITY, 4 WEEK RESISTANCE
$9
FORD WSS-M2P177-C1
Published Date: 05/29/2019
PAINT PERFORMANCE, METAL SUBSTRATES, LOW VISIBILITY, 4 WEEK RESISTANCE ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M2P177-C1
Published Date: 09/19/2011
PAINT PERFORMANCE, METAL SUBSTRATES, LOW VISIBILITY, 4 WEEK RESISTANCE ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M2P177-C1
Published Date: 05/25/2010
PAINT PERFORMANCE, METAL SUBSTRATES, LOW VISIBILITY, 4 WEEK RESISTANCE ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M2P177-C1
Published Date: 05/21/2009
PAINT PERFORMANCE, METAL SUBSTRATES, LOW VISIBILITY, 3 WEEK RESISTANCE ***TO BE USED WITH FORD WSS-M99P1111-A***
$9

Related products

FORD WSS-M4D926-A2
Published Date: 09/10/2010
POLYCARBONATE (PC), IMPACT MODIFIED, 25% MINIMUM RECYCLED CONTENT MOLDING COMPOUND ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD NSP K-FASTENERS
Published Date: 01/01/1995
NSP CUSTOMARY K-FASTENERS
$9
FORD WSB-M1H600-A
Published Date: 01/24/2003
FABRIC, TRAPEZOID PATTERN, WOVEN ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD SK-M99J9579-A
Published Date: 03/21/2012
HARDENER ***TO BE USED WITH FORD WSS-M99P1111-A***
$9

Best-Selling Products

AS (RISSB) 1085.1:2019
Published Date: 09/25/2019
Railway Track Material, Part 1: Steel Rails
$49.5
AS (RISSB) 1085.14:2019
Published Date: 12/02/2019
Railway track material, Part 14: Prestressed concrete sleepers
$49.5
AS (RISSB) 1085.17:2021
Published Date: 06/22/2021
Railway track material, Part 17: Steel sleepers
$50.49
AS (RISSB) 1085.20:2020
Published Date: 06/23/2020
Railway track materials, Part 20: Welding of steel rail
$12.078
AS (RISSB) 1085.21:2020
Published Date: 06/23/2020
Railway track material, Part 21: Turnouts, switches and crossings
$26.532
AS (RISSB) 1085.22:2020
Published Date: 03/24/2020
Railway track materials: Alternative material sleepers
$49.5