FORD WSS-M4G373-A1 PDF

FORD WSS-M4G373-A1 PDF

Name:
FORD WSS-M4G373-A1 PDF

Published Date:
04/05/2022

Status:
[ Revised ]

Description:

PUMPABLE NON-SETTING SEALANT ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?

The specification defines the basic material requirements for a pumpable non-setting sealant used to prevent corrosion within an underbody high voltage traction battery seal joint with one or more bare (uncoated) aluminum mating surface. The following specification is the minimum required material performance and property attributes to proceed to sub-system and system level Design Validation testing.


Edition : 22
File Size : 1 file , 160 KB
Number of Pages : 3
Published : 04/05/2022

History

FORD WSS-M4G373-A1
Published Date: 01/04/2023
PUMPABLE NON-SETTING SEALANT ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M4G373-A1
Published Date: 04/05/2022
PUMPABLE NON-SETTING SEALANT ***TO BE USED WITH FORD WSS-M99P1111-A***
$9

Related products

FORD WSK-M4D656-A
Published Date: 07/29/2008
ABS MOLDING COMPOUND, HIGH HEAT RESISTANT, HIGH IMPACT STRENGTH ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD M6C12-B
Published Date: 06/01/1985
FIRE RESISTANT HYDRAULIC FLUID
$9
FORD WSE-M10A96-A1
Published Date: 03/06/2012
SINTERED IRON, MOLYBDENUM, NICKEL, COPPER ALLOY ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD SK-M4D9940-A
Published Date: 07/24/2000
THERMOPLASTIC POLYOLEFINE ELASTOMER, SEMI RIGID
$9

Best-Selling Products

NCSL CALIB
Published Date:
Calibration Laboratory Manager´s Guidebook
NCSL RISP-1
Published Date: 01/01/2017
Josephson Voltage Standard
NCSL RISP-3
Published Date: 08/01/1997
Quantized Hall Resistance
NCSL RISP-4
Published Date: 07/01/1998
Deadweight Pressure Gauges
NCSL RISP-5
Published Date: 01/01/2017
Two-Pressure, Two Temperature Humidity Generator
NCSL RP-10
Published Date: 01/01/2004
Operation of Electric Utility Metrology Lab