FORD WSS-M5P8-B2 PDF

FORD WSS-M5P8-B2 PDF

Name:
FORD WSS-M5P8-B2 PDF

Published Date:
04/05/2012

Status:
[ Revised ]

Description:

LIGHTING METALIZATION, METAL SUBSTRATES ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?

This specification defines the performance requirements for metalized surfaces of reflective lighting components. This coating system involves vapor deposition of metal in a vacuum, with an associated basecoat and topcoat, as required.


Edition : 12
File Size : 1 file , 53 KB
Number of Pages : 5
Published : 04/05/2012

History

FORD WSS-M5P8-B2
Published Date: 02/26/2018
LIGHTING METALIZATION, METAL SUBSTRATES ***TO BE USED WITH FORD WSS-M99P1111-A***
FORD WSS-M5P8-B2
Published Date: 04/05/2012
LIGHTING METALIZATION, METAL SUBSTRATES ***TO BE USED WITH FORD WSS-M99P1111-A***
$9

Related products

FORD ESB-M6J60-A
Published Date: 05/10/2012
PRIMER, PLASTISOL, ADHESIVE ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSB-M3G210-A
Published Date: 12/10/2020
TAPE, ELASTOMERIC, PRESSURE SENSITIVE ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M1H756-A
Published Date: 12/09/2015
FABRIC, TWILL PATTERN, DOBBY WOVEN ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSK-M4D739-A4
Published Date: 01/13/2006
POLYAMIDE 12 (PA12), RIGID, HIGH HEAT STABILIZED MOLDING COMPOUND ***TO BE USED WITH FORD WSS-M99P1111-A***
$9

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36