FORD WSS-M99P25-C PDF

FORD WSS-M99P25-C PDF

Name:
FORD WSS-M99P25-C PDF

Published Date:
09/22/2016

Status:
[ Revised ]

Description:

WATER QUALITY, INITIAL FILL - ENGINE COOLANT ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?

General

The design wave calculation by the short term stochastic method is provided in the ABS Rules for Building and Classing Mobile Offshore Drilling Units (MODU Rules). The ABS Rules for Building and Classing Floating Production Installations (FPI Rules) require the installation’s hull strength and fatigue assessment in the site-specific environmental conditions, considering both 100-year return period environmental events and wave scatter diagram data of wave height/period joint occurrence distributions. As a supplement to select the design wave from the site specific environmental conditions, these Guidance Notes provide the detailed procedures to determine the design wave by the long term stochastic method for non-ship type offshore structures.


Edition : 16
File Size : 1 file , 40 KB
Number of Pages : 2
Published : 09/22/2016

History

FORD WSS-M99P25-C
Published Date: 02/28/2023
WATER QUALITY, INITIAL FILL - ENGINE COOLANT ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M99P25-C
Published Date: 04/30/2020
WATER QUALITY, INITIAL FILL - ENGINE COOLANT ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M99P25-C
Published Date: 09/22/2016
WATER QUALITY, INITIAL FILL - ENGINE COOLANT ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M99P25-C
Published Date: 09/28/2015
WATER QUALITY, INITIAL FILL - ENGINE COOLANT ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M99P25-C
Published Date: 05/16/2014
WATER QUALITY, INITIAL FILL - ENGINE COOLANT ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M99P25-C
Published Date: 11/03/2011
WATER QUALITY, INITIAL FILL - ENGINE COOLANT ***TO BE USED WITH FORD WSS-M99P1111-A***
$9

Related products

FORD ESL-M2D291-A2
Published Date: 02/09/1984
HOSE, REINFORCED RUBBER, FUEL LINE
$9
FORD WH 400
Published Date: 09/11/2020
SPRING PINS - SLOTTED TYPE HEAVY SERIES CATEGORY 550.040 BEH
$9
FORD ESK-M14J233-A
Published Date: 01/01/2012
THINNER ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD FLTM EU-AQ 006-01
Published Date: 01/31/2001
CONTROL TEST - CHROMATE ON PHOSPHATE COATED OR PLATED PARTS
$9

Best-Selling Products

IEEE/ANSI 101-1987
Published Date: 12/31/1988
IEEE Guide for the Statistical Analysis of Thermal Life Test Data
$67.2
IEEE/ANSI 18-1980
Published Date: 12/15/1980
IEEE Standard for Shunt Power Capacitors
$23.4
IEEE/ANSI 213-1961
Published Date: 04/06/1961
ANSI/IEEE Radio Interference: Methods of Measurement of Conducted Interference Output to the Power Line from FM and Television Broadcast Receivers in the Range of 300 kHz to 25 MHz
$16.5
IEEE/ANSI 262-1968
Published Date: 1968
USA Standard Test Code for Distribution, Power and Regulating Transformers, and Shunt Reactors
$19.5
IEEE/ANSI 315-1975
Published Date: 12/29/1975
IEEE Standard for Graphic Symbols for Electrical and Electronics Diagrams (Including Reference Designation Letters)
$39.9
IEEE/ANSI 315A-1986
Published Date: 09/12/1986
American National Standard - Supplement to Graphic Symbols for Electrical and Electronics Diagrams
$12.9