FORD WSS-M99P40-A PDF

FORD WSS-M99P40-A PDF

Name:
FORD WSS-M99P40-A PDF

Published Date:
03/05/2009

Status:
[ Active ]

Description:

SPRAYABLE BED LINER, TWO COMPONENT, POLYOL ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?

This specification defines the material and performance of a spray applied polyol based elastomeric film (WSS-M99P40-A1) and an isocyanate hardener (WSS-M99P40-A2) for use on exterior pickup box inner tubs where a low gloss texture appearance, high flexibility, high durability, and impact resistance are required. This system is specified for assembly plants and component suppliers, covering all processes including in-department and pre-delivery repairs.


Edition : 09
File Size : 1 file , 42 KB
Number of Pages : 8
Published : 03/05/2009

History

FORD WSS-M99P40-A
Published Date: 03/05/2009
SPRAYABLE BED LINER, TWO COMPONENT, POLYOL ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M99P40-A
Published Date: 10/08/2008
SPRAYABLE BED LINER, TWO COMPONENT, POLYOL ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M99P40-A
Published Date: 08/22/2008
SPRAYABLE BED LINER, TWO COMPONENT, POLYOL ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD WSS-M99P40-A
Published Date: 03/12/2008
SPRAYABLE BED LINER, TWO COMPONENT, POLYOL ***TO BE USED WITH FORD WSS-M99P1111-A***
$9

Related products

FORD FLTM BZ 105-03
Published Date: 08/06/2009
FUEL SYSTEM COMPATIBILITY
$9
FORD FLTM BU 112-02
Published Date: 08/17/2022
PEEL ADHESION OF PRESSURE SENSITIVE TAPES
$9
FORD WSS-M1P85-B1
Published Date: 02/28/2019
PLATING, ELECTROLYTIC ZINC, 5 MICROMETERS, THIN FILM PASSIVATE ***TO BE USED WITH FORD WSS-M99P1111-A***
$9
FORD SK-M4P9100-A
Published Date: 02/02/1995
ALUMINUM, ANODIC COATING, EXTERIOR
$9

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138