GME GME L-1B1201-3 PDF

GME GME L-1B1201-3 PDF

Name:
GME GME L-1B1201-3 PDF

Published Date:
02/01/2013

Status:
[ Not for New Design ]

Description:

Subjective Evaluation of the Heating System During Warm-up - Tunnel Test

Publisher:
General Motors Europe

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$12.9
Need Help?
ENGLISH/GERMAN

Purpose

With this subjective evaluation shall be evaluated the heating capacity and the comfort of a vehicle heating system during the warm-up phase of the vehicle.


Edition : 3
File Size : 1 file , 840 KB
Number of Pages : 17
Published : 02/01/2013

History

GME GME L-1B1201-3
Published Date: 02/01/2013
Subjective Evaluation of the Heating System During Warm-up - Tunnel Test
$12.9
GME GME L-1B1201-3
Published Date: 04/12/1995
Subjective Evaluation of the Heating System During Warm-Up Phase, Tunnel Test
$23.4

Related products

GME TM 165000
Published Date: 11/01/2009
General Requirements for Textile Materials on PUR-Foam (for Leather without PUR-Foam), in the Assembly Laminated to a Carrier Material
GME QK 001954
Published Date: 04/01/2012
Blend from ABS and PC with Glass Fibres

Best-Selling Products

ASQ A3534-1-1993
Published Date: 01/01/1993
ANSI/ISO/ASQ Standard - Statistics - Vocabulary and Symbols - Probability and General Statistical Terms (Revision and Redesignation of ANSI/ASQ A1 and A2-1987)
$19.5
ASQ B1-B3-1996
Published Date: 02/26/1996
Guide for Quality Control Charts - Control Chart Method of Analyzing Data - Control Chart Method of Controlling Quality During Production - Includes B1, B2, and B3
$17.7
ASQ C1-1996
Published Date: 01/01/1996
Specifications of General Requirements for a Quality Program - SAME AS ANSI Z1.8-1971
$14.7
ASQ D1160-1995
Published Date: 01/01/1995
Formal Design Review
$14.7