GMNA 9986459 PDF

GMNA 9986459 PDF

Name:
GMNA 9986459 PDF

Published Date:
04/01/2020

Status:
[ Revised ]

Description:

Low Bake Waterborne Basecoats

Publisher:
General Motors North America

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$23.4
Need Help?
ENGLISH

Purpose/Material Description.

Each combination of specific BC and CC must be tested and approved as a BC/CC topcoat system. The individual components are not interchangeable. In addition, the topcoat system is part of the total coating system and must meet the requirements as outlined in GMW3005, those set forth in this specification, and on the engineering drawings. Performance on finished parts must be demonstrated per GMW14671 (metal parts) and GMW14797 (plastic parts)


Edition : 2
File Size : 1 file , 180 KB
Number of Pages : 5
Published : 04/01/2020

History

GMNA 9986459
Published Date: 04/01/2022
Low Bake Waterborne Basecoats
$12.9
GMNA 9986459
Published Date: 04/01/2020
Low Bake Waterborne Basecoats
$23.4
GMNA 9986459
Published Date: 12/01/2015
Low Bake Waterborne Basecoats
$23.4

Related products

GMNA GM9073P
Published Date: 02/01/2000
Sheet Metal Surface Texture Measurements
GMNA 9982257
Published Date: 11/01/2016
Adhesive/Sealant, Room Temperature Vulcanizing, Oxime Cure for Engine Sealing Applications
$12.9
GMNA GMP.PUR.036
Published Date: 05/01/2013
Polyurethane RRIM – 10% Calcium Silicate, 420 MPa Flexural Modulus
GMNA GM9907P
Published Date: 03/01/2011
Interior Trim Hand Peel Strength Procedure

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138