GMNA GMP.E/P.026 PDF

GMNA GMP.E/P.026 PDF

Name:
GMNA GMP.E/P.026 PDF

Published Date:
12/01/1993

Status:
[ Revised ]

Description:

Polyolefin Alloy - 8% Maximum Glass/Mineral Filled, 575 MPa Flexural Modulus

Publisher:
General Motors North America

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$23.4
Need Help?
ENGLISH

1 SCOPE.

This specification covers the properties of integrally colored, weather resistant, 700 MPa nominal flexural modulus polyolefin alloy, pellet form, injection molding compound. For the purpose of this specification, polyolefin alloy is defined as an alloy of polypropylene plastic and EP or EPDM rubber.


Edition : 1
File Size : 1 file , 140 KB
Number of Pages : 2
Published : 12/01/1993

History

GMNA GMP.E/P.026
Published Date: 07/01/2012
Polyolefin Alloy - 8% Maximum Glass/Mineral Filled, 575 MPa Flexural Modulus
$12.9
GMNA GMP.E/P.026
Published Date: 12/01/1993
Polyolefin Alloy - 8% Maximum Glass/Mineral Filled, 575 MPa Flexural Modulus
$23.4

Related products

GMNA GM2715M
Published Date: 03/01/2014
Carpet Materials (Floor/Nonfloor)
GMNA GM10231D
Published Date: 07/01/2012
Protrusion and Frame Cross Section Dimensions
$23.4
GMNA GM9200P
Published Date: 03/01/2016
Accelerated Aging and Steaming
GMNA GM9508P
Published Date: 08/01/2010
Chip Resistance of Coating

Best-Selling Products

API 062 (DP)
Published Date: 10/01/1990
An Historical Overview of Solid Waste Management in the Petroleum Industry
$4.5
API 083 (RS)
Published Date: 08/01/1996
Octane Requirements of the Motor Vehicle Fleet and Gasoline Grade Sales
$4.5
API 10A Addendum 1
Published Date: 04/01/2000
Addendum 1 - Specification for Cements and Materials for Well Cementing
Free Download
API 10A Addendum 2
Published Date: 12/01/2000
Addendum 2 - Specification for Cements and Materials for Well Cementing - Also Incorporates Addendum 1
$4.2
API 10B Addendum 1
Published Date: 10/01/1999
Addendum 1 - Recommended Practice for Testing Well Cements
Free Download
API 10B Addendum 2
Published Date: 11/01/2000
Addendum 2 - Recommended Practice for Testing Well Cements
Free Download