GMNA GMP.PP.037 PDF

GMNA GMP.PP.037 PDF

Name:
GMNA GMP.PP.037 PDF

Published Date:
06/01/2001

Status:
[ Revised ]

Description:

Polypropylene - Copolymer, UV Stabilized, High Impact, Injection Molding Grade

Publisher:
General Motors North America

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$23.4
Need Help?
ENGLISH

1 Scope

This specification covers the properties of UV stabilized, high impact, polypropylene copolymer. 1.1 Application. Typical applications include the fol-lowing: side shields.


Edition : 3
File Size : 1 file , 26 KB
Number of Pages : 3
Published : 06/01/2001

History

GMNA GMP.PP.037
Published Date: 01/01/2011
Polypropylene – Copolymer, UV Stabilized, High Impact, Injection Molding Grade
$12.9
GMNA GMP.PP.037
Published Date: 06/01/2002
Polypropylene - Copolymer, UV Stabilized, High Impact, Injection Molding Grade
$23.4
GMNA GMP.PP.037
Published Date: 06/01/2001
Polypropylene - Copolymer, UV Stabilized, High Impact, Injection Molding Grade
$23.4
GMNA GMP.PP.037
Published Date: 01/01/1995
Polypropylene - Copolymer, UV Stabilized, High Impact, Injection Molding Grade
$23.4

Related products

GMNA GMP.PA6.005
Published Date: 04/01/2017
Nylon 6 - Copolymer, Heat Stabilized, Impact Modified
$12.9
GMNA GMP.PBTP.005
Published Date: 11/01/2012
PBTP - 30% Glass Fiber Reinforced, Flame Retardant (V-0)
$12.9
GMNA 9986105
Published Date: 05/01/2019
Friction Modified, Synchromesh Transmission Fluid
GMNA GMN11014
Published Date: 09/01/2010
Paint, One or Two Component, Interior, Sunscreen Lotion Resistant for Polyurethane
$12.9

Best-Selling Products

CS UK CAS01
Published Date: 01/01/2003
The provision of holes in reinforced concrete beams
$7.5
CS UK CAS02
Published Date: 01/01/2014
Suspended concrete floors: maximum size of pour allowable and location of construction joints
$6
CS UK CAS03
Published Date: 02/01/2014
Straightening and rebending reinforcement on site
$6
CS UK CAS04
Published Date: 01/01/2014
Congested reinforcement: effects on placing and compacting concrete
$6
CS UK CAS05
Published Date: 04/01/2014
Holding down bolts in concrete: Suggested design procedures to BS 8110-1
$7.5
CS UK CAS06
Published Date: 01/01/2003
Reinforcement ripple
$7.5