GMW GMW14482 PDF

GMW GMW14482 PDF

Name:
GMW GMW14482 PDF

Published Date:
05/01/2006

Status:
[ Revised ]

Description:

HVAC Blower, Stepper and DC Motor Noise Evaluation Procedure

Publisher:
General Motors Worldwide

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$23.4
Need Help?
ENGLISH HISTORICAL VERSION

Note: Nothing in the specification supersedes applicable laws and regulations unless specific exemption has been obtained.

Note: In the event of conflict between the English and domestic language, the English language shall take precedence.

Purpose.

To define subsystem level noise measurements of HVAC blowers, stepper motors and DC motors that are used in heater modules or front and rear air condition modules. This procedure is used to gain knowledge of the N&V behavior of a blower module at the subsystem level before prototype vehicles are available. The measurements made on bare blower modules are comparable to in-car HVAC system measurements except for the effect of cavity resonances on the absolute noise level when measured in vehicle.

Foreword.

The noise emission of the HVAC module subsystem must be recorded to apply the objective methods for Sound Quality Metric evaluation. This subsystem has multiple modes of operation. Each mode of operation must be recorded independently for analysis. This procedure describes the operating conditions of the HVAC module subsystem, the appropriate sound recording methods for those operating conditions, and the analysis methods necessary for objective Sound Quality Metric evaluation.

Because blower noise emission is dependent on blower airflow rate, airflow measurements are a necessary part of an objective assessment of blower noise. Airflow rate is especially important when evaluating multiple blowers. Blower noise levels from multiple blowers can be compared by relating blower noise levels to airflow rates.

Applicability.

This procedure is appropriate for blowers on all kind of heating and air condition modules. It is also applicable for all kind of flap adjustment noises, such as, recirculation flaps, temperature flaps, ventilation flaps, foot room flaps, defrost flaps, or rear vent flaps whether they are driven by a DC or a stepper motor.


Edition : 1
File Size : 1 file , 1.8 MB
Number of Pages : 10
Published : 05/01/2006

History

GMW GMW14482
Published Date: 07/01/2024
HVAC Module Operational Noise and Vibration Evaluation Procedure
$23.4
GMW GMW14482
Published Date: 11/01/2017
HVAC Blower, Stepper and DC Motor Noise and Vibration Evaluation Procedure
GMW GMW14482
Published Date: 05/01/2012
HVAC Blower, Stepper and DC Motor Noise and Vibration Evaluation Procedure
GMW GMW14482
Published Date: 12/01/2006
HVAC Blower, Stepper and DC Motor Noise and Vibration Evaluation Procedure
GMW GMW14482
Published Date: 05/01/2006
HVAC Blower, Stepper and DC Motor Noise Evaluation Procedure
$23.4

Related products

GMW GMW16861
Published Date: 03/01/2021
Test Method to Quantify Cleanliness of Electric Motor and Components
$12.9
GMW GMW16579
Published Date: 10/01/2019
Material and Process Testing Requirements for Press Hardened Steel and Stamping Suppliers
$12.9

Best-Selling Products

PTI C30.1
Published Date: 01/01/2003
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 1 - FIELD FUNDAMENTALS
$21.9
PTI C30.1S
Published Date: 01/01/2006
ENTRENAMIENTO Y CERTIFICACIÓN DE PERSONAL DE CAMPO PARA POSTENSADO SIN TENDONES ADHERENTES
$21.9
PTI C30.2
Published Date: 01/01/2002
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - IRONWORKER
PTI C30.3
Published Date: 01/01/2006
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - POST-TENSIONING INSPECTOR
$29.4
PTI C30.4 ERTA
Published Date: 01/14/2022
Training and Certification of Field Personnel for Multistrand & Grouted Post‐Tensioning Student Manual
$0.3
PTI C30.4
Published Date: 02/01/2007
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR BONDED POST-TENSIONING