GMW GMW14658 PDF

GMW GMW14658 PDF

Name:
GMW GMW14658 PDF

Published Date:
10/01/2020

Status:
[ Revised ]

Description:

Double Wall Construction Steel Tubing

Publisher:
General Motors Worldwide

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$23.4
Need Help?
ENGLISH HISTORICAL VERSION * CONTAINS COLOR

Note: Nothing in this standard supercedes applicable laws and regulations.

Note: In the event of conflict between the English and domestic language, the English language shall take precedence.

Purpose/Material Description.

This standard covers double wall construction tubing wherein the two walls and the joints are copper brazed in a reducing atmosphere to produce tubing satisfactory for hydraulic brake lines, lubrication oil lines, vacuum lines, air brake lines, etc. There are requirements for the base metal, the optional coating materials, and the coated tubing. These requirements are applicable to the product coming out of the tube mills and the coating application lines, which are sometimes separate facilities. This tubing is used in the production of customized parts and assemblies. It is recommended that those parts and assemblies be validated for corrosion performance, conductivity and continuity, strength, appearance, and other critical properties unique to the particular application.

Symbols.

Not applicable.

Applicability.

Double wall steel tubing is typically used for automotive hydraulic brake lines.

Remarks.

Double wall steel tubing should not be used for fuel lines because residual copper can contribute to the formation of sour gas.


Edition : 4
File Size : 1 file , 540 KB
Number of Pages : 13
Published : 10/01/2020

History

GMW GMW14658
Published Date: 04/01/2022
Double Wall Construction Steel Tubing
$12.9
GMW GMW14658
Published Date: 10/01/2020
Double Wall Construction Steel Tubing
$23.4
GMW GMW14658
Published Date: 06/01/2015
Double Wall Construction Steel Tubing
$23.4
GMW GMW14658
Published Date: 02/01/2012
Double Wall Construction Steel Tubing
$23.4
GMW GMW14658
Published Date: 04/01/2007
Double Wall Construction Steel Tubing
$23.4

Related products

GMW GMW14984
Published Date: 01/01/2019
Brake Thermal Abuse Inertia Dynamometer Test
$23.4
GMW GMW17476
Published Date: 12/01/2015
Material and Performance Requirements for Spark Plug Boots and Distributor Boots
$12.9
GMW GMW18530
Published Date: 02/01/2022
Topcoat System, Low Bake 1K Waterborne Basecoat/2K Solventborne Clearcoat
$12.9
GMW GMW18709
Published Date: 01/01/2024
Primer Surfacer - Solventborne - Medium Solids - High Bake
$12.9

Best-Selling Products