Name:
GMW GMW16117 PDF
Published Date:
02/01/2009
Status:
[ Revised ]
Publisher:
General Motors Worldwide
Introduction
Note: Nothing in this standard supersedes applicable laws and regulations.
Note: In the event of conflict between the English and domestic language, the English language shall take precedence.
Requirements and specifications contained in this document describe the quality, reliability, durability, and performance for the Coolant System Overflow Reservoir Assembly.
This specification establishes the requirements for a Coolant System Overflow Reservoir Assembly. The functions, performance, design constraints, and validation required of the component are defined in this document. All requirements of this specification must be met in order to demonstrate design and production validation.
Mission/Theme. The Coolant System Overflow Reservoir Assembly provides an unpressurized reservoir for coolant expansion and contraction. It also helps to control coolant afterboil, and serves as the customer coolant service level check and fill point. The engineering test schedule contained within this specification defines the minimum performance and durability criteria necessary for Design and Production Validation. In addition, the minimum requirements for Production Audit testing of ongoing production are outlined. The schedule is intended as a supplement to normal material inspections, dimensional checking and in-process controls, and should in no way adversely influence adherence to other inspection operations.
Classification. Build of Material (BOM) row 313 Coolant Plumbing & Hardware.
| Edition : | 1 |
| File Size : | 1 file , 100 KB |
| Number of Pages : | 6 |
| Published : | 02/01/2009 |