GMW GMW16193 PDF

GMW GMW16193 PDF

Name:
GMW GMW16193 PDF

Published Date:
04/01/2024

Status:
[ Active ]

Description:

Quality and Chrome Plater Approval Process

Publisher:
General Motors Worldwide

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
PDF * ENGLISH CURRENT VERSION * CONTAINS COLOR

This specification describes the General Motors approval process for decorative chrome plating. The plater shall obtain an approval for each substrate material, chemical source, finish, and facility combination.

Note: Nothing in this standard supercedes applicable laws and regulations.

Note: In the event of conflict between the English and domestic language, the English language shall take precedence.

Purpose/Material Description.

The entire Class A part surface is to meet all requirements.

Symbols.

Not applicable.

Applicability.

Chrome plated exterior and interior applications.

Remarks.

Finish suppliers (platers) should be approved before Tier 1 sourcing. The Tier 1 should select approved platers from their respective regions. If a new plater is to be developed, GM Materials Engineering, Supplier Quality (SQ), and Purchasing shall agree to the proposed plater before sourcing is finalized.

If a new plater is to be developed, the Tier 1 is responsible for:

a. Determining the plater’s ability to meet all pre-production part submission dates utilizing production processes.

b. Consulting with GM Materials Engineering.

c. Ensuring that the plater is approved before Integration Vehicle Engineering Release. The Tier 1 should identify an approved backup plating source in these cases.

Once a plater has successfully completed the approval process, their approval record (trim transmittal) will be available on the GM Supply Power web site. The trim transmittal will support the Tier 1 - GM Production Part Approval Process (PPAP). One (1) approval may be applicable for future parts with the same combination. Any substrate, solution chemistry, supplier, process, or facility change is subject to re-qualification (including a new trim transmittal).

Approvals are contingent on satisfactory quality performance. Poor quality performance may lead to an additional audit and quality improvement plan, at the discretion of the GM Materials Engineer and Supplier Quality Global Process Lead. If the plater is non-compliant with the subsequent action items, removal from the approved list may occur.

Note: An approval is based on single part geometry. Subsequent parts shall be tested to meet GM PPAP requirements (GM Materials Engineering reserves the right to require an additional approval if part complexity warrants).


Edition : 5.
Number of Pages : 6
Published : 04/01/2024

History

GMW GMW16193
Published Date: 04/01/2024
Quality and Chrome Plater Approval Process
GMW GMW16193
Published Date: 02/01/2022
Quality and Chrome Plater Approval Process
$23.4
GMW GMW16193
Published Date: 02/01/2015
Quality and Chrome Plater Approval Process
$23.4
GMW GMW16193
Published Date: 05/01/2010
Quality and Chrome Plater Approval Process
$23.4
GMW GMW16193
Published Date: 03/01/2010
Quality and Chrome Plater Approval Process
$23.4

Related products

GMW GMW16869
Published Date: 09/01/2022
Powertrain Compartment Acoustical Insulation Materials
$12.9
GMW GMW16288
Published Date: 11/01/2015
Hybrid (Low Temperature) Coolant Surge Tank
$12.9
GMW GMW16929
Published Date: 01/01/2024
Organic Coatings for Exterior Aluminum Trim Parts
$12.9
GMW GMW15523
Published Date: 08/01/2023
Door Inner Water Deflection/Barrier/Acoustic Material
$12.9

Best-Selling Products

GMKOREA EDS-A-0008
Published Date: 02/01/2006
대우자동차 상호 및 상표
$23.4
GMKOREA EDS-A-0008
Published Date: 02/01/2006
DAEWOO MOTERO CO., LTD. LOGOTYPE & SYMBOL MARK
$23.4
GMKOREA EDS-A-0009
Published Date: 02/01/2012
Procedure for the Management of the Engineering Standards
$23.4
GMKOREA EDS-A-0011
Published Date: 04/14/2006
기술표준(EDS) 발행 절차 (해외공장용)
$23.4
GMKOREA EDS-A-0011
Published Date: 04/14/2006
EDS (Engineering, Daewoo motor co., ltd. Standards) ISSUE PROCEDURE FOR OVERSEAS PLANTS
$23.4
GMKOREA EDS-A-0012
Published Date: 10/01/2010
Part Identification; Date Writing Method