GMW GMW17528 PDF

GMW GMW17528 PDF

Name:
GMW GMW17528 PDF

Published Date:
06/01/2021

Status:
[ Active ]

Description:

Electronic Brake Control Module (EBCM) Based Driveline Protection Performance

Publisher:
General Motors Worldwide

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
gmw-gmw17528_2615404

Choose Document Language:
0
Need Help?
PDF * ENGLISH CURRENT VERSION

Purpose.

The purpose of this standard is to determine the performance of a vehicle equipped with Electronic Brake Control Module (EBCM) based driveline protection. This standard may be used for development or validation of requirements within the GM Vehicle Technical Specification (VTS) and for regional regulations.

Four (4) different areas of driveline protection are considered; side to side axle differential protection, front to rear halfshaft/center differential protection, all-wheel drive (AWD) thermal protection and power hop protection.


Edition : 2.
Number of Pages : 3
Published : 06/01/2021

History

GMW GMW17528
Published Date: 06/01/2021
Electronic Brake Control Module (EBCM) Based Driveline Protection Performance
GMW GMW17528
Published Date: 03/01/2016
Electronic Brake Control Module (EBCM) Based Driveline Protection Performance
23.40 €

Related products

GMW GMW3116
Published Date: 06/01/2022
Recyclability/Recoverability
12.90 €
GMW GMW18047
Published Date: 07/01/2018
Air Delivery Components Cleanliness Requirements and Discipline
23.40 €
GMW GMW16515
Published Date: 06/01/2022
Elastomeric Polyurethane Foam, Bio-renewable and Recycled Content
12.90 €

Best-Selling Products

AI/ASPHALT AI MS-16
Published Date: 03/01/1983
ASPHALT IN PAVEMENT PRESERVATION & MAINTENANCE
AI/ASPHALT AI MS-17
Published Date: 01/01/1969
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 06/01/1983
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 01/01/2000
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-1
Published Date: 01/01/2008
THICKNESS DESIGN ASPHALT PAVEMENTS FOR HIGHWAYS & STREETS
19.50 €
AI/ASPHALT AI MS-22
Published Date: 01/01/1983
CONSTRUCTION OF HOT MIX ASPHALT PAVEMENTS
8.70 €