GMW GMW3275 PDF

GMW GMW3275 PDF

Name:
GMW GMW3275 PDF

Published Date:
02/01/2011

Status:
[ Revised ]

Description:

Hexalobular Socket Pan Head Screw and Washer Assemblies with Plain Washer for Plastics Product Grade A

Publisher:
General Motors Worldwide

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$23.4
Need Help?
ENGLISH HISTORICAL VERSION

This standard specifies the characteristics of hexalobular socket pan head screw and washer assemblies for plastics (see Figure 1). This standard is based on Opel standard ON 2589.


Edition : 4
File Size : 1 file , 170 KB
Number of Pages : 3
Published : 02/01/2011

History

GMW GMW3275
Published Date: 04/01/2016
Hexalobular Socket Pan Head Screw and Washer Assemblies with Plain Washer for Plastics Product Grade A
$12.9
GMW GMW3275
Published Date: 02/01/2011
Hexalobular Socket Pan Head Screw and Washer Assemblies with Plain Washer for Plastics Product Grade A
$23.4
GMW GMW3275
Published Date: 05/01/2005
Hexalobular Socket Pan Head Screw and Washer Assemblies with Plain Washer, for Plastics Product Grade A
$23.4
GMW GMW3275
Published Date: 06/01/2001
Hexalobular Socket Pan Head Screw and Washer Assemblies with Plain Washer, for Plastics
$23.4
GMW GMW3275
Published Date: 06/01/2000
Hexalobular Socket Pan Head Screw and Washer Assemblies with Plain Washer, for Plastics
$23.4

Related products

GMW GMW14173
Published Date: 10/01/2015
Sound Transmission Loss (STL) Master Test Procedure
$23.4

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1