HOLDEN HN 2294 PDF

HOLDEN HN 2294 PDF

Name:
HOLDEN HN 2294 PDF

Published Date:
11/01/1997

Status:
[ Revised ]

Description:

Adhesive - One Part Urethane - Warm Applied

Publisher:
Holden Limited

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$23.4
Need Help?

1. SCOPE

This specification covers the requirements of a one component, warm applied urethane adhesive. The adhesive is primarily intended as a glass bonding adhesive, but also can be used to bond painted body parts, with or without the use of paint primer. The adhesive may improve the structural rigidity of the vehicle in terms of body stiffness. The adhesive, by means of its warm applied nature causes it to have quick grab properties. The adhesive will not significantly degrade in structural and/or adhesive properties and performances when subjected to direct weathering or dynamic vehicle vibration. 1.1 This system must be capable of being dispersed with production equipment. It shall be compatible with production systems.


Edition : 97
File Size : 1 file , 30 KB
Number of Pages : 5
Published : 11/01/1997

History

HOLDEN HN2294
Published Date: 06/01/2013
Adhesive - One Part Urethane - Warm Applied
HOLDEN HN 2294
Published Date: 11/01/1997
Adhesive - One Part Urethane - Warm Applied
$23.4

Related products

HOLDEN HN1708
Published Date: 02/01/2013
Sealer - Bitumastic - Hot Flow Type
HOLDEN HN1790
Published Date: 07/01/2012
Acoustical Sealing Patch

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138