IEC 61280-1-3 Ed. 3.0 en:2021 PDF

IEC 61280-1-3 Ed. 3.0 en:2021 PDF

Name:
IEC 61280-1-3 Ed. 3.0 en:2021 PDF

Published Date:
07/01/2021

Status:
Active

Description:

Fibre optic communication subsystem test procedures - Part 1-3: General communication subsystems - Measurement of central wavelength, spectral width and additional spectral characteristics

Publisher:
International Electrotechnical Commission

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$57
Need Help?

This part of IEC 61280 provides definitions and measurement procedures for several wavelength and spectral width properties of an optical spectrum associated with a fibre optic communication subsystem, an optical transmitter, or other light sources used in the operation or test of communication subsystems. This document also provides definitions and measurement procedures for side-mode suppression ratio and signal-to-source spontaneous emission ratio.

The measurement is done for the purpose of system construction and/or maintenance. In the case of communication subsystem signals, the optical transmitter is typically under modulation.

NOTE Different properties can be appropriate to different spectral types, such as continuous spectra characteristics of light-emitting diodes (LEDs), as well as multilongitudinal-mode (MLM), multitransverse-mode (MTM) and single-longitudinal mode (SLM) spectra, which are characteristic of laser diodes (LDs).


Edition : 3.0
File Size : 1 file , 1.4 MB
ISBN(s) : 9782832299548
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 26
Published : 07/01/2021

History

IEC 61280-1-3 Ed. 3.0 en:2021
Published Date: 07/01/2021
Fibre optic communication subsystem test procedures - Part 1-3: General communication subsystems - Measurement of central wavelength, spectral width and additional spectral characteristics
$57
IEC 61280-1-3 Ed. 3.0 b:2021
Published Date: 07/01/2021
Fibre optic communication subsystem test procedures - Part 1-3: General communication subsystems - Measurement of central wavelength, spectral width and additional spectral characteristics
$57
IEC 61280-1-3 Ed. 2.0 b:2010
Published Date: 03/18/2010
Fibre optic communication subsystem test procedures - Part 1-3: General communication subsystems - Central wavelength and spectral width measurement
$39.9
IEC 61280-1-3 Ed. 2.0 en:2010
Published Date: 03/18/2010
Fibre optic communication subsystem test procedures - Part 1-3: General communication subsystems - Central wavelength and spectral width measurement
$31.2
IEC 61280-1-3 Ed. 1.0 b:1998
Published Date: 12/21/1998
Fibre optic communication subsystem basic test procedures - Part 1-3: Test procedures for general communication subsystems - Central wavelength and spectral width measurement
$19.8

Related products

IEC 62148-7 Ed. 1.0 b:2003
Published Date: 02/10/2003
Fibre optic active components and devices - Package and interface standards - Part 7: SFF LC 10-pin transceivers
$16.8
IEC 60794-5-10 Ed. 1.0 b:2014
Published Date: 02/05/2014
Optical fibre cables - Part 5-10: Family specification - Outdoor microduct optical fibre cables, microducts and protected microducts for installation by blowing
$83.4
IEC 61280-4-2 Ed. 3.0 b:2024
Published Date: 05/01/2024
Fibre-optic communication subsystem test procedures - Part 4-2: Installed cable plant - Single-mode attenuation and optical return loss measurement
$144.9
IEC 62343-5-1 Ed. 2.0 en:2014
Published Date: 11/25/2014
Dynamic modules - Part 5-1: Test methods - Dynamic gain tilt equalizer - Gain tilt settling time measurement
$43.5

Best-Selling Products

VDI/DGQ 3441
Published Date: 03/01/1977
Statistical Testing of the Operational and Positional Accuracy of Machine Tools; Basis
VDI/DGQ 3442
Published Date: 03/01/1977
Statical examination of exactly working of turing machines
VDI/DGQ 3443
Published Date: 03/01/1977
Statistical examination of exactly working of milling machines
VDI/DGQ 3444
Published Date: 09/01/1978
Statistical control of exactly working and positioning of coordinate drilling machines and machining centers
VDI/DGQ 3445 Sheet 1
Published Date: 03/01/1977
Statistical examination of exactly working of grinding machines; fundamentels
VDI/DGQ 3445 Sheet 2
Published Date: 03/01/1977
Statistical examination of exactly working of grinding machines; external cylindrical grinding machines with center points; plunge-cut grinding operation