New IEEE Standard - Active.
General technical recommended practice for operation of pulverized coal-fired boilers in power plants is provided, including start-up, shutdown, operation and maintenance, and emergency and failure detection/handling/prevention. In this document, a boiler with existing single units with a capacity of 300 MW to 600 MW in thermal power plants, where pulverized coal is combusted to generate electricity and/or to supply heat, is discussed. Development of boiler operation code as a reference to determine detailed operation steps and/or procedures for a particular boiler in the plant is outlined. The specifications of manufacturers, successful experiences from practice, and stipulations defined in other related high-level standards/regulations/codes are also considered.
| File Size : | 1
file
, 1.5 MB |
| ISBN(s) : | 9781504476188, 9781504474061, 9781504474054 |
| Note : | This product is unavailable in Russia, Ukraine, Belarus |
| Number of Pages : | 74 |
| Product Code(s) : | STD24615, STDPD24615, STDPL24735 |
| Published : | 04/30/2021 |