IETF RFC 5670 PDF

IETF RFC 5670 PDF

Name:
IETF RFC 5670 PDF

Published Date:
11/01/2009

Status:
[ Active ]

Description:

Metering and Marking Behaviour of PCN-Nodes

Publisher:
Internet Engineering Task Force

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$10.8
Need Help?

The objective of Pre-Congestion Notification (PCN) is to protect the quality of service (QoS) of inelastic flows within a Diffserv domain in a simple, scalable, and robust fashion. This document defines the two metering and marking behaviours of PCN-nodes. Threshold-metering and -marking marks all PCN-packets if the rate of PCN-traffic is greater than a configured rate ("PCN-threshold-rate"). Excesstraffic- metering and -marking marks a proportion of PCN-packets, such that the amount marked equals the rate of PCN-traffic in excess of a configured rate ("PCN-excess-rate"). The level of marking allows PCN-boundary-nodes to make decisions about whether to admit or terminate PCN-flows.


Edition : 09
File Size : 1 file , 28 KB
Number of Pages : 20
Published : 11/01/2009

History


Related products

IETF RFC 5350
Published Date: 09/01/2008
IANA Considerations for the IPv4 and IPv6 Router Alert Options
$9.6
IETF RFC 8160
Published Date: 04/01/2017
IUTF8 Terminal Mode in Secure Shell (SSH)
$9
IETF RFC 2661
Published Date: 08/01/1999
Layer Two Tunneling Protocol "L2TP"
$17.7

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138